BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Chittenango, New York. Completed plans call for site work for a road / highway; and for paving for a road / highway.

PUBLIC NOTICE Village of Chittenango Asphalt Paving Bid Notice NOTICE IS GIVEN that the Board of Trustees of the Village of Chittenango, County of Madison, in the State of New York solicits bids for asphalt paving including tack coat. Specifications may be obtained via email or mail by contacting the Village Clerk's Office at 222 Genesee St, Chittenango, New York or viewed online at: website public works Questions. Please contact Village Administrator, Paul Gregory at (315) 870-0971. The Board of Trustees reserves the right to reject any and all bids received. Karen M. Hawkins Village Clerk-Treasurer, Village of Chittenango. Milling: The Village of Chittenango is responsible for all milling and cleanup. Village of Chittenango forces will provide all the Maintenance, sweeping/cleaning, tack coating and paving operations. However, the paving company will be responsible for the protection of traffic and flagging. 1. Oneida St. (From the Pottery Rd. to Lakeport Rd.) 153Tx2T Tack Coat: Prior to paving Oneida St., the contractor will apply tack coat to the entire area to be paved. The application rate for tack coat shall be approximately .05 gallons per square yard. Note: Any final sweeping and/or cleaning, will be the responsibility of The Village of Chittenango. Paving: Pave the milled area of Oneida St. using 1.5" average compacted thickness of Type 7 Top, at a width of approximately 21 ft. wide for 153T. Note: Prior to placing the surface course, it may be necessary to true and level the roadway in areas determined by the Highway Superintendent and the Contractor. 2. Mohawk St., (From Lakeport Rd. to 50' past the driveway to the American Legion) 950* x 2T Tack Coat: Prior to paving Mohawk St., the contractor will apply tack coat to the entire area to be paved. The application rate for tack coat shall be approximately .05 gallons per square yard. Note: Any final sweeping and/or cleaning, will be the responsibility of The Village of Chittenango. Paving: Pave the milled area of Mohawk St. using 1.5" average compacted thickness of Type 7 Top, at a width of approximately 21 ft. wide for 950'. Note: Prior to placing the surface course, it may be necessary to true and level the roadway in areas determined by the Highway Superintendent and the Contractor. 3. Legion Dr. (1 of 2) (From the canal to Mohawk Dr.) 910*x22' Tack Coat: Prior to paving Legion Dr., the contractor will apply tack coat to the entire area to be paved. The application rate for tack coat shall be approximately .05 gallons per square yard. Note: Any final sweeping and/or cleaning, will be the responsibility of The Village of Chittenango. Paving: Pave the milled area of Legion Dr. using 1.5" average compacted thickness of Type 7 Top, at a width of approximately 22 ft. wide for 910'. Note: Prior to placing the surface course, it may be necessary to true and level the roadway in areas determined by the Highway Superintendent and the Contractor. 4. Legion Dr. (2 of 2) (From Mohawk Dr. to Rte. 5) 600'x25' Tack Coat: Prior to paving Legion Dr., the contractor will apply tack coat to the entire area to be paved. The application rate for tack coat shall be approximately .05 gallons per square yard. Note: Any final sweeping and/or cleaning, will be the responsibility of The Village of Chittenango. Paving: Pave the milled area of Legion Dr. using 1.5" average compacted thickness of Type 7 Top, at a width of approximately 25 ft. wide for 600'. Note: Prior to placing the surface course, it may be necessary to true and level the roadway in areas determined by the Highway Superintendent and the Contractor. 5. Brinkerhoff St. (From Skelding St to Madison St) 151O'x21*Tack Coat: Prior to paving Brinkerhoff St., the contractor will apply tack coat to the entire area to be paved. The application rate for tack coat shall be approximately .05 gallons per square yard. Note: Any final sweeping and/or cleaning, will be the responsibility of The Village of Chittenango. Paving: Pave the milled area of Brinkerhoff St. using 1.5" average compacted thickness of Type 7 Top, at a width of approximately 21 ft. wide for 151 O'. Note: Prior to placing the surface course, it may be necessary to true and level the roadway in areas determined by the Highway Superintendent and the Contractor. 6. Skelding St. (From Falls Blvd to Brinkerhoff St.) 36O'x21' Tack Coat: Prior to paving Skelding St., the contractor will apply tack coat to the entire area to be paved. The application rate for tack coat shall be approximately .05 gallons per square yard. Note: Any final sweeping and/or cleaning, will be the responsibility of The Village of Chittenango. Paving: Pave the milled area of Skelding St. using 1.5" average compacted thickness of Type 7 Top, at a width of approximately 21 ft. wide for 360'. Note: Prior to placing the surface course, it may be necessary to true and level the roadway in areas determined by the Highway Superintendent and the Contractor. 7. Kenyon St. (From Falls Blvd to Madison St.) 670' x 21' Tack Coat: Prior to paving Kenyon St., the contractor will apply tack coat to the entire area to be paved. The application rate for tack coat shall be approximately .05 gallons per square yard. Note: Any final sweeping and/or cleaning, will be the responsibility of The Village of Chittenango Paving: Pave the milled area of Kenyon St. using 1.5" average compacted thickness of Type 7 Top, at a width of approximately 21 ft. wide for 670'. Note: Prior to placing the surface course, it may be necessary to true and level the roadway in areas determined by the Highway Superintendent and the Contractor. 8. Pottery Rd. (From Lakeport Rd. to Oneida St.) 1300'x20' Tack Coat: Prior to paving Pottery Rd., the contractor will apply tack coat to the entire area to be paved. The application rate for tack coat shall be approximately .05 gallons per square yard. Note: Any final sweeping and/or cleaning, will be the responsibility of The Village of Chittenango.Paving: Pave the milled area of Pottery Rd. using 1.5" average compacted thickness of Type 7 Top, at a width of approximately 20 ft. wide for 1300". Note: Prior to placing the surface course, it may be necessary to true and level the roadway in areas determined by the Highway Superintendent and the Contractor. 9. Water St. (From Lakeport Rd. to Pottery Rd.) 44O'x22' Tack Coat: Prior to paving Water St., the contractor will apply tack coat to the entire area to be paved. The application rate for tack coat shall be approximately .05 gallons per square yard. Note: Any final sweeping and/or cleaning, will be the responsibility of The Village of Chittenango. Paving: Pave the milled area of Water St. using 1.5" average compacted thickness of Type 7 Top, at a width of approximately 22 ft. wide for 440'. Note: Prior to placing the surface course, it may be necessary to true and level the roadway in areas determined by the Highway Superintendent and the Contractor.

Award

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
54
Bidding Soon
733
All Active Projects
410
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

May 23, 2024

img_map_placeholder

Multiple Locations, Chittenango, NY


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.