Site work for a water / sewer project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000366576 The Work to be performed under the 2023 PRV, ARV, Large Valve, Meter Rehabilitation Phase 2 Project consists of furnishing all labor, materials equipment, tools, supplies to rehabilitate three each Pressure Relief Valve (PRV) Vaults, two each 24 inch water transmission valves, five each Air Relief Valve (ARV) Vaults and ten each three inch Turbine Meter Vaults. The rehabilitation needs are due to structural or access safety concerns, corroded and or inoperable assets or the need for adding operational controls to improve service to the Water System. PRE-QUALIFICATION: Prime Contractors have been pre-qualified for this Invitation to Bid. Bids shall not be accepted from firms other than those pre-qualified firms on this solicitation. This advertisement is for the sole purpose of identifying this procurement action to potential subcontractors who may wish to participate through the selected prime contractor. Question Deadline 11/07/2024 at 2:00 PM MT Questions are submitted online No, Any questions must be submitted in writing by email to John Bruneau, Project Manager, at jbruneau@auroragov.org, and to Nathan Jones, Contract Administrator at njones@auroragov.org. Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond, Certified Check or Cashier's Check made payable to the City of Aurora in an amount of not less than five percent (5%) of the amount of the Bid. In addition, the bid guarantee shall be accompanied in the same file as the bid. The Contract Documents require that all work be Substantially Complete by November 30, 2025 with Final Completion by December 31, 2025. Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $2,500.00 per The estimated cost for this project is from $2,200,000.00 to $2,500,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City of Aurora reserves the right to amend, by an addendum or addendums, this IFB at any time and/or a multiple number of times prior to the date set for receipt of the submission of responses/offers.

Post-Bid

Water / Sewer

$2,500,000.00

Public - City

Site Work

25

24

4

4

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
64
Bidding Soon
1,320
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2024

January 20, 2025

Project location map

Multiple Locations, Aurora, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.