BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2024 at 8:00 PM

Updated May 3, 2024

Demolition, site work and addition to an educational facility in Fostoria, Ohio. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

Fostoria City Schools is seeking a construction manager to work with the Architect/ Engineer (A/E) Garmann-Miller in order to construct an addition to our elementary building located at 1202 H.L. Ford D (A) • Construct a building addition of approximately 16,042 sq. ft. to the east side of the existing Fostoria Elementary School building. ? FCS is committed to creating learning spaces that foster 21st century skills and the opportunity for collaboration. ? Primary age group that will be using this space would be 6th grade students. (B) The selected Construction Manager at Risk (“CM”), as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Owner, the breakdown of the Agreement detailed cost components, to address the Owner’s project requirements and refine the project schedule. As required by the Agreement, and as properly authorized, provide the following categories of services: provide constructability review comments on documents produced by the A/E during the Schematic Design, Design Development, and Construction Document stages; develop and maintain estimates of probable construction cost, value engineering, project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process, Construction and Closeout Stage. The preconstruction and construction services are generally described below. Subcontracts including but not limited to Plumbing, Fire Protection, HVAC, Electrical and AV/Technology will be awarded by the CM to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Owner, the A/E and the CM. The Owner shall have access to all books, records, documents and other data in the CM's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement.

Post-Bid

Educational

$7,250,000.00

Public - City

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
126
Bidding Soon
1,670
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

May 1, 2025

Project location map

To Be Determined, Fostoria, OH


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.