Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and addition to an educational facility in Fostoria, Ohio. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.
Fostoria City Schools is seeking a construction manager to work with the Architect/ Engineer (A/E) Garmann-Miller in order to construct an addition to our elementary building located at 1202 H.L. Ford D (A) • Construct a building addition of approximately 16,042 sq. ft. to the east side of the existing Fostoria Elementary School building. ? FCS is committed to creating learning spaces that foster 21st century skills and the opportunity for collaboration. ? Primary age group that will be using this space would be 6th grade students. (B) The selected Construction Manager at Risk (“CM”), as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Owner, the breakdown of the Agreement detailed cost components, to address the Owner’s project requirements and refine the project schedule. As required by the Agreement, and as properly authorized, provide the following categories of services: provide constructability review comments on documents produced by the A/E during the Schematic Design, Design Development, and Construction Document stages; develop and maintain estimates of probable construction cost, value engineering, project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process, Construction and Closeout Stage. The preconstruction and construction services are generally described below. Subcontracts including but not limited to Plumbing, Fire Protection, HVAC, Electrical and AV/Technology will be awarded by the CM to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Owner, the A/E and the CM. The Owner shall have access to all books, records, documents and other data in the CM's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement.
Post-Bid
Educational
$7,250,000.00
Public - City
Addition, Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2024
May 1, 2025
To Be Determined, Fostoria, OH
Related To This Project
Fostoria, OH
Bid Date: May 08 2024
Fostoria, OH
--
Fostoria, OH
Bid Date: Jun 28 2024
Fostoria, OH
Bid Date: Oct 04 2024
Fostoria, OH
Bid Date: Mar 29 2024
Fostoria, OH
Bid Date: Apr 02 2024
Fostoria, OH
Bid Date: Mar 05 2024
Fostoria, OH
Bid Date: Nov 28 2023
Fostoria, OH
Bid Date: Jan 29 2019
Fostoria, OH
Bid Date: Aug 30 2023
Fostoria, OH
Bid Date: Aug 07 2023
Fostoria, OH
Bid Date: Jul 11 2023
Fostoria, OH
Bid Date: May 25 2023
Fostoria, OH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.