Site work for a water / sewer project in Tupper Lake, New York. Completed plans call for site work for a water / sewer project.
The Contractor will provide pipe testing, repairs, and insulation to Building 2, Units 1 and 8 Crawlspace for OPWDD Sunmount DDSOO. The Contractor will provide all labor and materials necessary to complete the work in a professional manner according to scope of work. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid and Certified Payrolls must be submitted at time of completion. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of crawlspace pipe testing, repairs, and insulation, and before the removal of equipment, the Contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent or their representative. includes, but is not necessarily limited to the following 1. Perform hydrostatic testing on all mechanical system piping in the crawlspace area and identify any and all points of failure. 2. Perform testing on plumbing system (domestic water and drainage) piping in the crawlspace and identify any and all points of failure. 3. Make repairs, as necessary to all mechanical and plumbing piping, fittings, valves, etc. deemed faulty during testing procedure(s). 4. There shall be no hot work performed in the building. All connections shall be copper Propress or threaded fittings, as appropriate. Dielectric fittings are to be used where the possibility of galvanic series corrosion exists. 5. Any inactive and/or abandoned piping, fittings, valves, etc. are to be removed and properly disposed of off site, at the expense of the contractor. 6. Any and all materials removed as part of the work being performed are to be properly dispose of, off site, at the expense of the contractor. 7. Upon completion of repairs, all mechanical system piping and all DHW piping shall be insulated. 8. All work shall be performed in accordance with any and all applicable NYS Code requirements. 9. This is an occupied facility. It is necessary that plumbing systems remain functional throughout the project. 10. EPDM floor covering throughout the crawlspace is to be protected at all times while work is being performed. Any penetration of EPDM floor covering is to be reported IMMEDIATELY to the appropriate Maintenance Supervisor and all work is to CEASE until appropriate repairs can be made. All questions or requests for information shall be submitted, in writing to Mark.g.woods@opwdd.ny.gov. Sunmount DDSO Bldg 2, Units 1 & 8 Crawlspace Pipe Testing, Repairs, & Insulation. Building 2, Units 1 and 8 crawlspace pipe testing, repairs, and insulation. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 60 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid and Certified Payrolls must be submitted at time of completion. Refer to attached specification for the following scope of work. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of crawlspace pipe testing, repairs, and insulation, and before the removal of equipment, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent or his/her representative. Contract term: 1 year Location: Sunmount DDSO 2445 State Route 30 Tupper Lake, NY 12986 All questions or requests for information shall be submitted, in writing to Mark.g.woods@opwdd.ny.gov.
Post-Bid
Water / Sewer
$250,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2024
August 14, 2024
2445 NY-30, Tupper Lake, NY
Related To This Project
Tupper Lake, NY
Bid Date: May 29 2024
Tupper Lake, NY
Bid Date: May 29 2024
Tupper Lake, NY
Bid Date: May 31 2024
Tupper Lake, NY
Bid Date: Jun 24 2024
Tupper Lake, NY
Bid Date: Jun 25 2024
Tupper Lake, NY
Bid Date: May 28 2024
Tupper Lake, NY
Bid Date: Jul 12 2024
Tupper Lake, NY
Bid Date: Aug 30 2024
Tupper Lake, NY
Bid Date: May 14 2024
Tupper Lake, NY
Bid Date: Mar 21 2024
Tupper Lake, NY
Bid Date: Apr 03 2024
Tupper Lake, NY
--
Tupper Lake, NY
Bid Date: Mar 28 2024
Tupper Lake, NY
Bid Date: Dec 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.