BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Tupper Lake, New York. Completed plans call for site work for a water / sewer project.

The Contractor will provide pipe testing, repairs, and insulation to Building 2, Units 1 and 8 Crawlspace for OPWDD Sunmount DDSOO. The Contractor will provide all labor and materials necessary to complete the work in a professional manner according to scope of work. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid and Certified Payrolls must be submitted at time of completion. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of crawlspace pipe testing, repairs, and insulation, and before the removal of equipment, the Contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent or their representative. includes, but is not necessarily limited to the following 1. Perform hydrostatic testing on all mechanical system piping in the crawlspace area and identify any and all points of failure. 2. Perform testing on plumbing system (domestic water and drainage) piping in the crawlspace and identify any and all points of failure. 3. Make repairs, as necessary to all mechanical and plumbing piping, fittings, valves, etc. deemed faulty during testing procedure(s). 4. There shall be no hot work performed in the building. All connections shall be copper Propress or threaded fittings, as appropriate. Dielectric fittings are to be used where the possibility of galvanic series corrosion exists. 5. Any inactive and/or abandoned piping, fittings, valves, etc. are to be removed and properly disposed of off site, at the expense of the contractor. 6. Any and all materials removed as part of the work being performed are to be properly dispose of, off site, at the expense of the contractor. 7. Upon completion of repairs, all mechanical system piping and all DHW piping shall be insulated. 8. All work shall be performed in accordance with any and all applicable NYS Code requirements. 9. This is an occupied facility. It is necessary that plumbing systems remain functional throughout the project. 10. EPDM floor covering throughout the crawlspace is to be protected at all times while work is being performed. Any penetration of EPDM floor covering is to be reported IMMEDIATELY to the appropriate Maintenance Supervisor and all work is to CEASE until appropriate repairs can be made. All questions or requests for information shall be submitted, in writing to Mark.g.woods@opwdd.ny.gov. Sunmount DDSO Bldg 2, Units 1 & 8 Crawlspace Pipe Testing, Repairs, & Insulation. Building 2, Units 1 and 8 crawlspace pipe testing, repairs, and insulation. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 60 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid and Certified Payrolls must be submitted at time of completion. Refer to attached specification for the following scope of work. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of crawlspace pipe testing, repairs, and insulation, and before the removal of equipment, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent or his/her representative. Contract term: 1 year Location: Sunmount DDSO 2445 State Route 30 Tupper Lake, NY 12986 All questions or requests for information shall be submitted, in writing to Mark.g.woods@opwdd.ny.gov.

Post-Bid

Water / Sewer

$250,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
36
Bidding Soon
477
All Active Projects
201
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2024

August 14, 2024

img_map_placeholder

2445 NY-30, Tupper Lake, NY


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.