BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Sugar Hill, Georgia. Working plans call for the renovation of a educational facility.

Lanier High School Family Consumer Science Lab And Avtf - Production and Editing Lab the furnishing of all labor, materials, and services necessary to perform the work for the following: Lanier High School Family Consumer Science Lab and AVTF - Production & Editing Lab, 918 Buford Highway NE, Sugar Hill, GA 30518. Contract, if awarded, will be on a lump sum basis. The bid may not be withdrawn for a period of sixty (60) days after date of opening. Bids must be accompanied by a bid bond payable to the Gwinnett County Board of Education, in an amount equal to five percent (5%) of the Base Bid. Performance Bond and Labor and Material Payment Bond, each equal to 100% of the Contract Sum will be required of the successful bidder. These bonds are to be executed by a Surety Company licensed to do business in the State of Georgia, be listed on "Department of the Treasury Circular 570" and have an A.M. Best Company rating of at least Class "A", with a Financial Size of VI or better. Bonds must be accompanied by letter stating company's current rating for verification prior to acceptance by the Owner and execution of the formal Owner/Contractor agreement. The Owner will make payments to the successful Contractor upon receipt of requests for payments, having been certified by the Architect, as fully covered and shown in the plans and specifications. Retainage as prescribed in the specifications and General Conditions of the Contract will be withheld. The above description is an advertisement for the submission of bids which are to be considered as offers for performance of work by the submitting party. The Owner reserves the right to accept or reject any or all bids and to waive technicalities. Time is of the essence to the Contract performance. Notice to Proceed will be issued after the Pre-Construction meeting as soon as all required paper work such as Contracts, Bonds, Insurance, etc. are in order. Contractor shall mobilize within ten (10) days of Notice to Proceed. Work cannot start prior to Thursday, May 23, 2024 and must be substantially complete by Friday, July 19, 2024. The HVAC system shall consist of the replacement of ceiling diffusers, flexible ductwork, return air boots, residential and commercial kitchen exhaust hours and associated ductwork, fans and controls. *GCPS has cancelled the following project:*

Final Planning

Educational

$250,000.00

Public - County

Renovation

35

21

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
57
Bidding Soon
1,578
All Active Projects
736
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.