BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2024 at 8:00 PM

Updated June 13, 2024

This is a service / maintenance or supply contract in Conchas Dam, New Mexico. Contact the soliciting agency for additional information.

This is a non-personal services contract for the maintenance of generators. Please see attached solicitation and PWS for more details. Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years. The Period of Performance reads as follows: Base Period: 12 months from date of award Option Period 1: 12 months from award of modification Option Period 2: 12 months from award of modification Option Period 3: 12 months from award of modification Option Period 4: 12 months from award of modification Place of Performance: The work to be performed under this contract will be performed at 200 Captain Kramer Ln, Conchas, NM 88416. The generators are specifically located at the maintenance yard, entrance to the dam, and at the irrigation headworks. The Contractor will notify the Conchas Operations Project Manager (OPM) at a minimum, ten (10) days prior to entering the property to perform inspections, testing, or maintenance activities. The generators are located within a controlled-access area, coordinate access with the Conchas OPM.

Post-Bid

Water / Sewer

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
8
Bidding Soon
55
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

June 11, 2024

Project location map

200 Captain Kramer Ln, Conchas Dam, NM

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.