EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Eufaula, Alabama. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

The OWNER will in no way be liable for any costs incurred by any bidder in the preparation of its Bid in response to this Advertisement for Bids. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the OWNER; the bidder shall show such evidence by clearly displaying its current license number on the outside of the sealed envelope in which the proposal is delivered. The Work includes the following principal items: Grading, Storm Drainage, Base, Paving, Markings and Electrical Any changes that may be agreed upon as a result of this meeting will be noted in an addendum sent to all plan holders. Total Contract Time for completion of the work is one hundred thirty-five (135) calendar days. Liquidated damages for delay will be in the amount of $1,000.00 per calendar day that the project remains incomplete after the specified completion time. $2,500 per calendar day over maximum runway closure time. Other Bidding Requirements, Contract Forms, Conditions of the Contract, Specifications, Drawings and other Bidding and Contract Documents may be examined at the office of the following: Barge Design Solutions, Inc., 2047 West Main Street, Dothan, Alabama 36301, Phone (334) 793-6266 City Of Eufaula, Alabama, 205 East Barbour Street, Eufaula, Alabama 36027; (334) 688-2000 Bid Security: Each BIDDER must deposit with his BID, as Bid Security, a Bid Bond payable to the OWNER in an amount equal to five (5) percent of the total amount Bid, but in no case more than $10,000.00. Contract Security: The Successful BIDDER will be required to furnish separate performance and payment bonds payable to the OWNER. Each bond shall be in an amount equal to 100% of the Contract Price as security for CONTRACTOR'S faithful performance and payment of all obligations under the Contract Documents. No BID may be withdrawn by the BIDDER within ninety (90) days after actual date of opening thereof. BIDS in the case of corporations not chartered in Alabama, must be accompanied by proper certificate evidencing that such corporation is authorized to do business in the State of Alabama. Bids are to be based upon prevailing wages in Barbour County, Alabama; and in no case are wages considered less than those predetermined by the Secretary of Labor, a schedule of which is contained in the Contract Documents. BIDDERS must certify that they do not, and will not, maintain or provide for their employees any facilities that are segregated on a basis of race, color, creed or national origins. BIDDERS must submit with their BID an EEO Report Statement as required by 41 CFR 60-1-7 (b). The Owner reserves the right to refuse to issue a proposal form to a prospective bidder should such bidder be in default for any of the following reasons: (a) Failure to comply with any prequalification regulations of the Owner, if such regulations are cited, or otherwise included, in the proposal as a requirement for bidding. (b) Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contracts in force (with the owner) at the time the owner issues the proposal to a prospective bidder. (c) Contractor default under previous contracts with the Owner. (d) Unsatisfactory work on previous contracts with the Owner. BIDS shall be on the forms included in the Bidding Documents and submitted in a sealed envelope clearly identified on the outside as follows: BID FOR CONSTRUCTION OF NEW PARTIAL PARALLEL TAXIWAY AIP PROJECT 3-01-0028-029-2023 SUBMITTED BY: (Name of Bidder with Bidder's Current Alabama General Contractor's License Number). The BID shall be addressed to: Hon. Jack Tibbs Jr. MAYOR 205 East Barbour Street Eufaula, Alabama 36027 BIDS submitted by mail shall be registered. The OWNER reserves the right to reject any and all BIDS, to waive any informalities or irregularities in the BIDS received, and to accept the BID which is deemed most favorable to the OWNER at the time and under the conditions stipulated.

Post-Bid

Transportation Terminals

$3,000,000.00

Public - City

Paving, Site Work

56

7

6

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Precast Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Lockers
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
27
Bidding Soon
418
All Active Projects
203
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

New Partial Parallel Taxiway

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.