BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a conference / convention center in Anaheim, California. Completed plans call for the renovation of a conference / convention center.

The work consists of providing the necessary labor, equipment, materials & knowledge to satisfactorily complete the work of the plans & specifications as generally described below ::... A. Demolition is minimal and is shown on Plans. B. Lighting: Modify existing lighting control system to include a change out of existing components to provide the equipment components of a single manufacturer throughout the facility. Existing switchgear, panel boards & branch circuiting shall remain as indicated. Furnish & install all raceways and appurtenant components & related work while keeping existing system in operation at all times. Title 24 energy compliance is not required... C. Wifi Network: Furnish & Install Wifi network equipment to support the independent operation of the new lighting control system... D. Electrical Power: Install new power circuit & related components to support the upgraded lighting control system & new Wifi network system... E. Perform miscellaneous work as may be reasonably inferred for integration of the 2 systems and seamless operation thereof. We have determined that this project will be subject to the provisions of the Community Workforce Agreement (CWA) the City entered into with the Los Angeles/Orange Counties Building Construction Trades Council and the Signatory Craft Councils & Local Unions. The CWA is a prehire collective bargaining agreement that establishes labor relations procedures. The work consists of furnishing & installing a Wifi network & a Lighting Control & Supervisory System that combines & integrates 3 separate lighting control systems, including all related components & appurtenant work thereto necessary for the proper construction, installation & commissioning of the proposed improvements. Question Deadline 07/31/2024 5:00 PM (PDT) PROVIDING A NEW "FACILITIES ONLY" WIFI NETWORK SYSTEM TO HOST FACILITY SYSTEMS; LIGHTING CONTROLS. ALL SWITCHGEAR, PANELBOARDS AND BRANCH CIRCUITING ARE EXISTING TO REMAIN. Location- 800 W Katella Ave Anaheim, CA 92802 Engineering Construction Estimate: $ 825,000.00 Start/Delivery Date 4th Quarter 2024 Project Duration 90 working days

Bid Results

Conference / Convention Centers

$1,023,076.00

Public - City

Renovation

37

14

6

4

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
130
Bidding Soon
2,331
All Active Projects
1,068
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

October 1, 2024

img_map_placeholder

800 W Katella Ave, Anaheim, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.