EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a clubhouse / community center in Milford, Michigan. Completed plans call for site work for a clubhouse / community center.

Reference Number 0000349655 The Village of Milford, Michigan is accepting sealed bid proposals from qualified professional firms to construct and install security fencing with two automatic gates at the civic center and vinyl coated chain link fencing adjacent to the Milford Skatepark. This work must be performed as specified accordance with the specifications contained in the Request For Proposals (RFP). Job Location 1100 Atlantic St, Milford MI 48381 Completion Date: June 30, 2024 SCOPE OF WORK The Contractor shall perform the following services in accordance with the requirements as defined and noted herein: 1. FENCE PROJECT A: Milford Civic Center a. Furnish and install 640 LF of 6' tall galvanized 9 ga chain link fence (line posts driven). b. Furnish and install one 6" x 20' and one 6' x 22' cantilever gate (gate posts embedded in concrete). i. A 6' x 22' cantilever gate currently owned by the Village may be repurposed. c. Furnish and install two Liftmaster commercial high-traffic slide gate operators, one yelp siren, two safety gate edge assembly, one single and dual height gooseneck pedestals, three vehicle detection loops, and three protection posts. d. See Addendum 1 for map of required fencing. 2. FENCE PROJECT B: Milford Skatepark a. Furnish and install 100 LF of 10' green, vinyl-coated chain link fence at the Milford Skatepark. The fencing will ultimately have sound barrier material installed via a separate contract. The materials has a weight of approximately 1.5 pound per square foot. b. Ensure fence stability to withstand wind loads associated with the flat and open surrounding area. Bid Results : Milford Civic Center Nationwide Construction Group $49,655 Milford Skatepark Nationwide Construction Group $8,750

Bid Results

Clubhouse / Community Centers

$58,405.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
132
Bidding Soon
1,360
All Active Projects
720
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

May 30, 2024

img_map_placeholder

1100 Atlantic St, Milford, MI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.