BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a civil project in Anaheim, California. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of July 9, 2024, project is cancelled. Project is no longer needed. The primary work takes place at the Oak Hills Reservoir and includes miscellaneous repairs. This project includes recoating the reservoir roof, paint touch up of the reservoir exterior wall coating and safety striping on the reservoir roof perimeter. The project also includes improvements to replace the tank's interior cathodic protection system, air-vents, outlet piping, and operational valving and installation of safety improvements to the reservoir ladder. The project is part of the Utilities' program to rehabilitate or replace aging infrastructure. This project is covered "Project Work" as defined in the Community Workforce Agreement (CWA) the City entered into with the Los Angeles/Orange Counties Building and Construction Trades Council and the Signatory Craft Councils and Local Unions. Project Liquidated Damages will be $800 per day. Q&A Deadline 04/22/2024 5:00 PM (PDT) - Online Q&A Yes The project scope of work at this location includes the following: Replacement of the existing steel electrical control panel and concrete pad. Remove and save the interior electrical and SCADA components for re-installation in the new cabinet. Contractor to use one of the City Approved System Integrators to perform the Endpoint Installation and Programming. Installation and programming the Endpoint is to be performed by one of the APU preapproved automation and system integrators. The Contractor must procure their service as a sub-contractor during construction to complete the following; 1) PLC and Operator Interface Terminal (OIT) programming and testing onsite and 2) Wonderware programming and testing at the Lenain Water Treatment Plant (LWTP).

Project Abandoned

Water / Sewer

$1,876,905.00

Public - City

Renovation, Site Work

21

7

35

7

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
107
Bidding Soon
2,311
All Active Projects
1,035
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

July 10, 2024

img_map_placeholder

Multiple Locations, Anaheim, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.