Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 20, 2024 at 8:00 PM

Updated May 21, 2024

Site work and paving for a bridge / tunnel in Columbia, Missouri. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Bids must be received in Purchasing and date stamped by the bid closing date and time. Bids shall be in a sealed envelope, have the bid number and description labeled on the outside of the envelope. Observable surface cracking on the East Boulevard Bridge concrete bridge deck will be mitigated with an Epoxy Polymer Wearing Surface (EPWS) on that portion of the bridge exposed to vehicular traffic. The portion of the bridge deck solely accessed by pedestrians is to be repaired with a ‘healer/sealer’ wearing surface. Cracks within the bridge deck slab that have a crack width between 1/8" and 1/4” shall be cap sealed and epoxy injected prior to placement of wearing surface, as detailed herein. The following sections provide a comprehensive procedure for repair of both the trafficway and pedway surfaces of the East Boulevard Bridge. Our firm performed an on-site evaluation of the East Boulevard bridge deck on December 15, 2023. The purpose ofthe site visit was to quantify the surface cracks that would require epoxy injection prior to the EPWS and healer/sealer overlays. Generally, observable ‘larger’ cracks displayed efflorescence below the bridge at the bottom of the bridge deck. Estimated quantities associated with the project are provided below for reference The subject bridge structure was built in 2017 and consists of two driving lanes with a pedestrian path immediately south adjacent The approximately 323-foot long bridge is comprised of a reinforced concrete deck atop plate girder I-beams with four spans between two abutments and three intermediate bents. The total width of the bridge deck is approximately 44’-9" with approximately 32’-0” being trafficway and the remainder pedway. Question Deadline 05/03/2024 at 5:00 PM CT

Bid Results

Bridges / Tunnels

$173,746.00

Public - City

Paving, Site Work

108

13

2

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
30
Bidding Soon
712
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

June 13, 2024

Project location map

East Blvd, Columbia, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed