BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Byron, Georgia. Completed plans call for the renovation of a educational facility.

The Contract Documents require, among other things, the furnishing of all materials, labor and equipment for construction of the Project. The Board reserves the right to make available other relevant documents or information concerning the Project. Any Proposal submitted in response to this Request should comply strictly with all requirements set forth in the Instructions to Proposers. Any such Proposal must contain the completed Proposal Form setting forth the contractor's proposed lump sum contract price for full and complete construction of the Project in conformity with all requirements of the Contract Documents. Any Proposal must include a fully executed Bid Bond in the amount of five percent (5%) of the proposed lump sum contract price (exclusive of any alternates and unit prices) in the form required by the Instructions to Proposers. As noted above, any contractor submitting a Proposal must also complete and submit the required Contractor's Qualification Statement and Questionnaire and a completed Subcontractor's Qualification Statement and Questionnaire for the electrical, mechanical, structural steel and roofing subcontractors. For any work requiring a specialty or professional license, only licensed subcontractors may be submitted for consideration, and copies of all applicable licenses shall be attached to the Subcontractors' Qualification Statements and Questionnaires. The Board in its evaluation of Proposals will rely upon a contractor's identification of proposed subcontractors. No Substitution of Subcontractors is Allowed, and in the Event of Any Attempted Substitution After the Date Designated at the Pre-proposal Meeting, the Board May, in Its Sole Discretion, Disqualify Any Proposal From Consideration or Cancel Any Contract Awarded to Any Such Contractor. In evaluating Proposals, the Board may seek additional information from any contractor concerning such contractor's Proposal or its proposed subcontractors' qualifications to construct the Project. The Board intends to award the construction contract to the responsible and responsive contractor whose Proposal is determined in writing to be the most advantageous to the Board, taking into consideration the following evaluation factors which are listed in their order of relative importance: (A) The reputation of the contractor for integrity. (20 Points) (B) The contractor's prior experience in constructing similar projects on schedule and within budget including at least two projects comparable in size and scope to this Project. (30 Points) (C) The contractor's proposed lump sum contract price for full and complete construction of the Project in conformity with all requirements of the Contract Documents. (50 Points) The Board will receive such Proposals at such time and place. Proposals received after said time will not be accepted. At the discretion of the Board, and in conformity with the applicable provisions of Georgia Law, the Board may afford contractors an opportunity for subsequent discussion, negotiation, and revision of Proposals. The Board reserves the right to reject any or all Proposals and to waive any technicalities or formalities. Any Proposal submitted in response to this Request shall remain open for acceptance by the Board, and same shall be honored by the contractor, for a period of thirty (30) days from the date set forth hereinabove for the receipt of Proposals. Davis Bacon Wage Rates are required on this project. The requirements for construction of the Project, and the duties and responsibilities of the contractor whose Proposal is accepted, are set forth in the Contract Documents which include the Instructions to Proposers; Form of Agreement and Supplementary General Conditions (the "Contract"); supplementary and other conditions; the drawings; the specifications; and, any addenda issued by the Engineer Any questions or comments concerning this Request for Proposals should be addressed in writing to the Director of Procurement

Post-Bid

Educational

$550,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

23

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
23
Bidding Soon
567
All Active Projects
203
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

June 20, 2024

img_map_placeholder

202 New Dunbar Rd, Byron, GA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.