Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in North Fork, Idaho. Working plans call for site work for a road / highway.
The project consists of preparing pits, mining materials, crushing pit material into blended aggregate with commercial source additives meeting contract requirements and performing the following: SLBD 2 items (Roads 579 and 568): Base Bid: 6 miles of crushed and placed Aggregate Surface Course, to a typical compacted depth of 4" on roads 579 (NFSR 40579 Stanley-Landmark or "Bear Valley Rd") and 568 (NFSR 40568 or Boundary-Dagger Rd). Also includes 10.50 miles of roadbed reconditioning. Option Items: **Up to 4.5 miles of crushed and placed Aggregate Surface Course, to a typical compacted depth of 4" on road 579. Select cleaning of culverts and bridge decks. Seafoam Road items (Road 008) - (starting after completion of 579 and 568 items): Base Bid: 3.9 miles of crushed and placed Aggregate Surface Course, to a compacted depth of 4" on road 008 (NFSR 40008 Beaver Creek Rd or "Seafoam Rd"). Also includes 7.10 miles of roadbed reconditioning. Option Item: **Up to 3.2 miles of crushed and placed Aggregate Surface Course, to a typical compacted depth of 4" on road 008. NOTE: Aggregate items shall utilize Blind Summit Pit or another approved source by the CO, including commercial source(s). ** "Up to" items are subject to availability of funds and not to exceed the quantity listed in the SCHEDULE OF ITEMS. Crush and Stockpile Aggregate includes development and use of pits, either government source or commercial source, to the specified gradation, including adding approximately 2% bentonite by weight to achieve desired properties. Actual % will be based on contractor's initial materials testing. This includes clearing and grubbing, removing overburden, mining, crushing, mixing aggregate with bentonite using a pugmill, weighing, creating stockpiles (including any loading or hauling to create stockpiles), testing, and final site reclamation including placing overburden, waste materials, mulching, and seeding. Perform the work in accordance with MSHA 30 CFR, part 56. Surfacing - Aggregate Surface Course includes necessary surface preparations before placing aggregate such as: material and quality control testing, surface preparation (reconditioning), clearing and grubbing, spreading, watering, compacting, temporary traffic control, erosion control measures, and all other incidental work to surface the road (see surfacing typical on sheet G-07 and attached road logs). Surface to the compacted depth specified in the attached road logs the full roadway width, including all existing turnouts and widenings. Intersecting roads shall be bladed, shaped and surfaced for a smooth transition. Spread control and staking for aggregate is the responsibility of the contractor. Protect the environment and resources impacted by all construction activity according to
Final Planning
Roads / Highways
$4,000,000.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2024
Multiple Locations, North Fork, ID
Related To This Project
North Fork, ID
--
North Fork, ID
--
North Fork, ID
Bid Date: May 13 2024
North Fork, ID
Bid Date: Mar 30 2022
North Fork, ID
Bid Date: Jun 06 2022
Boise, ID
Bid Date: May 03 2024
Coeur D Alene, ID
Bid Date: Apr 30 2024
Coeur D Alene, ID
Bid Date: May 07 2024
Pocatello, ID
Bid Date: Apr 17 2024
Boise, ID
Bid Date: Apr 25 2024
Nampa, ID
Bid Date: Apr 23 2024
Cascade, ID
Bid Date: May 02 2024
Rathdrum, ID
Bid Date: May 08 2024
Saint Maries, ID
Bid Date: Apr 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.