BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in North Fork, Idaho. Working plans call for site work for a road / highway.

The project consists of preparing pits, mining materials, crushing pit material into blended aggregate with commercial source additives meeting contract requirements and performing the following: SLBD 2 items (Roads 579 and 568): Base Bid: 6 miles of crushed and placed Aggregate Surface Course, to a typical compacted depth of 4" on roads 579 (NFSR 40579 Stanley-Landmark or "Bear Valley Rd") and 568 (NFSR 40568 or Boundary-Dagger Rd). Also includes 10.50 miles of roadbed reconditioning. Option Items: **Up to 4.5 miles of crushed and placed Aggregate Surface Course, to a typical compacted depth of 4" on road 579. Select cleaning of culverts and bridge decks. Seafoam Road items (Road 008) - (starting after completion of 579 and 568 items): Base Bid: 3.9 miles of crushed and placed Aggregate Surface Course, to a compacted depth of 4" on road 008 (NFSR 40008 Beaver Creek Rd or "Seafoam Rd"). Also includes 7.10 miles of roadbed reconditioning. Option Item: **Up to 3.2 miles of crushed and placed Aggregate Surface Course, to a typical compacted depth of 4" on road 008. NOTE: Aggregate items shall utilize Blind Summit Pit or another approved source by the CO, including commercial source(s). ** "Up to" items are subject to availability of funds and not to exceed the quantity listed in the SCHEDULE OF ITEMS. Crush and Stockpile Aggregate includes development and use of pits, either government source or commercial source, to the specified gradation, including adding approximately 2% bentonite by weight to achieve desired properties. Actual % will be based on contractor's initial materials testing. This includes clearing and grubbing, removing overburden, mining, crushing, mixing aggregate with bentonite using a pugmill, weighing, creating stockpiles (including any loading or hauling to create stockpiles), testing, and final site reclamation including placing overburden, waste materials, mulching, and seeding. Perform the work in accordance with MSHA 30 CFR, part 56. Surfacing - Aggregate Surface Course includes necessary surface preparations before placing aggregate such as: material and quality control testing, surface preparation (reconditioning), clearing and grubbing, spreading, watering, compacting, temporary traffic control, erosion control measures, and all other incidental work to surface the road (see surfacing typical on sheet G-07 and attached road logs). Surface to the compacted depth specified in the attached road logs the full roadway width, including all existing turnouts and widenings. Intersecting roads shall be bladed, shaped and surfaced for a smooth transition. Spread control and staking for aggregate is the responsibility of the contractor. Protect the environment and resources impacted by all construction activity according to

Final Planning

Roads / Highways

$4,000,000.00

Public - Federal

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
12
All Active Projects
4
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2024

img_map_placeholder

Multiple Locations, North Fork, ID


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.