Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Pueblo, Colorado. Completed plans call for the renovation of a 237,760-square-foot educational facility.
Reference Number 0000349671 Delivery Point: South High School Purchase Type: One Time Only- Delivery Date: Summer 2024 Pueblo School District 60 is seeking competitive proposals from qualified, reliable vendors to install a spray fluid polyurethane roof system at South High School. Please see RFP document for details. Question Deadline 04/26/2024 at 4:00 PM MT Questions are submitted online No, Questions concerning this RFP and the procedures for responding to the RFP should be directed in writing, e-mail or fax only, to: Tina Branom, Purchasing Agent Phone: 719-253-6404 Fax: 719-253-6406 Pueblo School District 60 E-mail: tina.branom@pueblod60.org 315 W. 11th St. Pueblo, CO 81003 Notice of Award May 15, 2024 (tentative) Bonding Requirements - Performance Bond 100 % - Payment Bond 100 % The District reserves the right to accept or reject any or all proposals. Scope of Work Pueblo School District 60 is seeking competitive proposals for the purchase, delivery, and installation for a fluid applied roof system at South High School. The fluid applied polyurethane roof coating project is approximately 237,760 square feet of BUR roof surface. 1. Contractors will conduct a pre-bid site visit and gather information for the development of a Work Plan. As part of the Work Plan and construction activities the Contractor will identify and comply with all applicable federal, state and local statutes. The Contractor will also comply with applicable terms and conditions of the contract.The finalized Work Plan and interval construction schedule will be submitted to the District's Project Manager for review and approval prior to the start of construction. The Project Manager will provide to the Contractor any existing drawings/specifications relating to the project. 3. All work must be performed during regular non-school hours and days, with the exception of school breaks. 4. The Contractor will mobilize construction forces necessary to begin the project within ten (10) business days after approval of the Work Plan and construction schedule by the District. 5. The Contractor will arrange for the following as needed: a. A secure staging area for storing equipment, materials, tools, and supplies, as the Contractor shall have sole liability for said items, and b. Access to and provision of utilities as needed for design and construction. 6. The following documents, plans, and reports will be provided to the Project Manager: a. Work Schedule and short interval schedule to include daily and weekly activities b. Hazardous Waste Disposal Certificates as requested or required, including all hazardous materials abatement/disposal plans needed for the project, and c. Inspection Reports as completed. 7. The Contractor will immediately notify the Project Manager of any and all issues that may result in a project delay and/or impact work quality or safety.
Post-Bid
Educational
$55,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2024
September 6, 2024
1801 Hollywood Dr, Pueblo, CO
Related To This Project
Pueblo, CO
Bid Date: May 06 2024
Pueblo, CO
Bid Date: May 06 2024
Pueblo, CO
Bid Date: May 17 2024
Pueblo, CO
Bid Date: Jan 27 2021
Pueblo, CO
Bid Date: Mar 19 2021
Pueblo, CO
Bid Date: May 02 2024
Pueblo, CO
Bid Date: May 02 2024
Pueblo, CO
Bid Date: May 08 2024
Pueblo, CO
Bid Date: May 06 2024
Pueblo, CO
Bid Date: May 08 2024
Pueblo, CO
Bid Date: May 06 2024
Pueblo, CO
Bid Date: Apr 30 2024
Pueblo, CO
Bid Date: May 07 2024
Pueblo, CO
Bid Date: May 02 2024
Pueblo, CO
Bid Date: May 02 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.