BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Chicago, Illinois. Completed plans call for site work for a water / sewer project.

Overburden Removal at Location of Battery E, Contract 23-098-3P, Metropolitan Water Reclamation District of Greater Chicago, Terrence J. O'brien Water Reclamation Plant, Skokie, Il. Bid Scopes: 2080-ENV - Environmental 2230-CLG - Clearing & Grubbing 2350-HLG - Trucking Services 2900-LND - Landscaping Description: 1. Prepare the construction work site. a. Install road traffic signage along Howard Street at job site construction access point. b. Prepare the equipment and trailer (optional) staging area. c. Prepare the truck staging and wash area. d. Prepare existing guard house facility for use. e. Install and maintain a stabilized construction entrance. f. Maintain the construction gravel road throughout the length of the project. 2. Implement dust, erosion and sediment run-off control measures. a. Install a silt fence around the perimeter of the work area and install straw bales and inlet protection baskets at all affected drainage structures as identified on the Plans. b. Use a mechanical sweeper to keep the roadways clean inside and outside the plant. b1. Roads outside the plant within a 2-mile travel distance (Howard Street, McCormick Boulevard and Oakton Street) require constant sweeping throughout the soil removal process. b2. All roads inside the plant also require regular daily sweeping. c. Keep and use a misting truck on-site for dust control. d. Perform regular inspections of the erosion and sedimentation control measures. e. Clean and flush all the drainage structures at the completion of the work. 3. Properly dispose of existing construction debris and other misc. materials. a. Remove and legally dispose of off-site any existing concrete blocks, portions of manholes, remnants of old aeration system, and any miscellaneous metal and wood construction materials identified on the Plans. b. Existing jersey barriers should be utilized on-site as directed by the Resident Engineer. c. Remove existing utilities (existing sprinkler system) as shown on the Plans. 4. Perform clearing and grubbing. a. Remove all trees and shrubs as identified on the Plans. 5. Remove the overburden soil. a. A certified soil contamination report has been prepared and will be used as basis for soil disposal at different soil disposal facilities. a1. The contractor shall not perform any additional soil testing unless as requested and/or coordinated with the Resident Engineer. b. There are portions of the soil that are contaminated which need to be disposed of at a Non-Special Waste (NSW) landfill. c. The remaining soil is classified as CCDD and can be disposed of at a CCDD facility or other approved location. d. A specific sequence of excavation and removal shall be followed as presented in the Plans. e. A land surveyor shall be utilized to outline the contaminated zones as identified on the Plans, establishing perimeters and elevations of the soil disposal zones, during different phases of the removal process 6. Restore the work site after the overburden soil removal. a. Perform final grading as shown on the Plans. b. Spread topsoil and provide seeding per the landscaping specification Interested and qualified protected class disadvantaged and veteran businesses (PCE, DBE, MBE, WBE, SBE, VBE, VOSB, SDVOSB) should contact, in writing, (certified letter, return receipt requested), IHC Construction to discuss the project IHC Construction will take affirmative action to ensure that all PCE, DBE, MBE, WBE, SBE, VBE, VOSB, SDVOSB Businesses have the maximum opportunity to compete for and perform portions of the contract and will not discriminate in the selection of subcontractors or suppliers. All quotes will be evaluated based upon price, value and demonstrated ability. **All quotes will be evaluated based upon price, value and demonstrated ability. Send Inquiries & Document Requests to: Estimating@IHCConstruction.com; ATTN: PAT WOOD PH: 847-742-1516, FX: 847-742-6610

Bid Results

Water / Sewer

$7,384,250.00

Public - City

Site Work

37

21

3

6

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
94
Bidding Soon
1,818
All Active Projects
791
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.