BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 20, 2026 at 7:00 PM

Updated February 21, 2026

Site work and paving for a mixed-use development in Crooks, South Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; and sidewalk / parking lot.

LSDC Overlay, Concrete Barrier, Joints, Approach Slabs, Portland Cement Pavement, Pedestrian Rail I29 - W 49th St 0.5 SW of 41st St Interch over I29 Length Miles: 0.018 Work Type 8 Contract Id: 9945 Prime Contractors must be prequalified in the work type specified for any bid $250,000 or greater. All bids will be checked for qualifications with results posted on the SDDOT website. The Department of Transportation reserves the right to reject any or all bids. Contractors may submit questions to the forum until 10:00 am CT on 2/13/2026. The department may post questions and answers until 10:00 am CT on 2/17/2026 at which time the forum will be closed. SDDOT - Item no 003 - LSDC, Barrier, Joints, Appr Slabs - I29 The Contractor will perform all construction staking. The staking work includes, but is not limited to, establishing or re-establishing the project centerline; establishing control points and benchmarks as needed; setting additional benchmarks as needed; taking original and final cross sections of all Contractor secured borrow sources and State designated borrow sources; taking cross sections of all topsoil stockpiles; and staking right-of-way, easements, and fence. The Contractor will perform all construction layout and reference staking necessary for the accurate control and completion of all grading, paving, drainage, median crossovers, signing, pavement marking, permanent benchmarks, detours, fence, and all other appurtenances required for the complete construction and acceptance of the work. The layout will include, but is not limited to, staking clearing line, and performing the miscellaneous staking as described in the plans and in this specification. Horizontal and vertical control has been established as shown on the plans. Each horizontal and vertical control point will be preserved or reset out of the work limits and available during and after construction is complete. Prior to the Department's final acceptance of the project, the Contractor will replace or reset any control that is disturbed during the construction of the project. The Contractor will provide the Department a list of the in-place control points, including coordinates and elevations relevant to the project control, at the end of the project.

Bid Results

Roads / Highways

$1,165,140.00

Public - State/Provincial

Paving, Site Work

73

8

12

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2026

April 20, 2026

Project location map

I29, Crooks, SD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.