BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and renovation of a water / sewer project in Milwaukie, Oregon. Conceptual plans call for the renovation of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

The Oregon Department of Transportation (“ODOT” or “Agency”) is seeking Proposals from Professional Services and Related Services consultants to provide engineering, environmental, planning, and technical services necessary for the design related to the Kellogg Creek Dam Restoration (Clackamas County) project (the “Project”). The selected Proposer shall provide engineering design services for the Project, including, but not limited to, National Environmental Policy Act (“NEPA”) services for the removal of Kellogg Creek dam, removal and replacement of OR99E structure (Bridge ID: 01949), and associated habitat restoration of the watershed (collectively, the “Services”). Proposers responding to this RFP do so solely at their expense, and Agency is not responsible for any Proposer expenses associated with this RFP. Project Elements: - Remove Kellogg Dam and restore a natural stream channel through the new Oregon 99E bridge crossing and Kellogg Lake. - Modernize Oregon 99E bridge with a safer and sustainable alternative including a multi-use pedestrian underpass between the City of Milwaukie and Willamette River waterfront, and a wildlife migration corridor. - Restore functional habitat in Kellogg Lake impoundment, including floodplain, wetlands, and riparian habitat, and restore hydrologic connectivity with the Lower Willamette River. - Add community enhancement features to the newly restored natural area including a trail, viewing and access points, and educational signage. Project Timeline: Phase 1: August 2022 to Summer 2023 = Initiation & Feasibility Phase 2: Summer 2023 to December 2024 = Design and Permitting Phase 3: January 2025 to December 2025 = Procurement & Initial Construction Activities Phase 4: January 2026 to December 2027 = Construction including Demolition and In-Water Work

Conceptual

Water / Sewer

$85,000,000.00

Public - State/Provincial

Demolition, Renovation, Site Work

1

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
62
Bidding Soon
1,086
All Active Projects
402
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2026

img_map_placeholder

To Be Determined, Milwaukie, OR


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.