BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated May 29, 2025

Renovation of a municipal facility in Bowling Green, Ohio. Design plans call for the renovation of a municipal facility.

As of May 28, 2025, an architect has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: The County is seeking architectural design services for an interior renovation project at the Wood County Common Pleas Court #1 Administrative Office Area. The renovations will include 1.) removal of an interior wall creating a waiting room, removal of closet in hallway to judges' chambers and opening to closet with west entrance, removal of door and wall creating a kitchenette for staff and removal of door to hallway leading to judge's chambers; 2.) placement of beam to replace interior wall; 3.) demolition of old cast iron drains and installation of new PVC drainpipe; 4.) demolition of two old air handlers and pneumatic control valves for judge's chambers and support staff area and install one new air handler; 5.) demolition of old pipe insulation with install of new pipe insulation to accommodate new air handler location; 6.) installation of new ceiling panels to include grid, tile, LED lights, and return air vents for the HVAC system; 7.) reconfiguration of all lighting in the main office, storage, sitting, and new office areas; 8.) reconfiguration of all electric to include phone jacks and cable drops for computers and printers; 9.) installation of new ADA bathroom door; 10.) painting (to include trim and shutters); 11.) installation of new carpet for the entire office, including judges' chambers; 12.) construction of a new wall on the west side of the newly opened closet area accessed through the hallway to judges' chambers; 13.) installation of new cabinets in the new closet area and kitchenette; and 14.) construction of a storage room for evidence in maintenance closet next to the office accessible only to the court reporter. The work will require interior design, electrical, mechanical and interior HVAC ductwork modifications. Along with the preparation of drawings, the County desires assistance with bid documents, the bidding process, and project management. The method of Contractor Selection has not been Determined at this time

Design

Municipal

$800,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
135
Bidding Soon
1,778
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2025

Project location map

1 Court House Square, Bowling Green, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.