BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Lynwood, California. Completed plans call for the renovation of a educational facility.

Scope of Work Overview: Bidder must be able to provide all management, labor, subcontractors, equipment, and materials for exterior painting of all campus buildings and doors and awnings. The contract time is anticipated to be 60 (Sixty) consecutive calendar days. THE SCOPE OF THE PROJECT INCLUDES, BUT NOT LIMITED TO THE FOLLOWING: 1. SURFACE PREPARATION AND RE-FINISHING OF ALL EXTERIOR PLASTER WALLS, SOFFITS, COLUMNS, FASCIA, GUTTERS, DOWNSPOUTS, PAINTED SURFACE MOUNTED CONDUIT, PAINTED DATA AND ELECTRICAL BOXES ETC. WITH NEW PAINT SYSTEM. 2. PREPARE ALL PAINTED METALLIC ELEMENTS TO RECEIVE HIGH PERFORMANCE ARCHITECTURAL GRADE PAINT. 3. SURFACE, PREPARATION AND RE-PAINTING OF ALL EXPOSED WOOD SOFFIT AND FRAMING, INCLUDING EXPOSED WOOD DECKING. 4. PREPARATION AND RE-FINISHING OF EXISTING COVERED WALK & LUNCH SHELTERS. (COLUMNS, BEAMS, SUPPORTS, TRIM, FASCIA, UNDERSIDE OF METAL DECK, ETC.) 5. PREPARATION AND RE-FINISHING OF ALL EXISTING ROOF EDGE FLASHING. 6. PREPARATION AND RE-FINISHING OF ALL EXPOSED METAL COLUMNS, HANDRAILS, GUARDRAILS, BRACKETS, DECORATIVE METAL ELEMENTS, ETC. 7. PREPARATION AND RE-FINISHING OF ALL METAL WINDOW FRAMES (EXTERIOR SURFACE ONLY). LIBRARY ALUMINUM FRAMED WINDOWS AND STOREFRONTS ARE NOT INCLUDED IN THE SCOPE OF WORK AT 2-STORY BUILDING. 8. PREPARATION AND RE-FINISHING OF ALL DOORS, FRAMES AND DOORS (INTERIOR, EXTERIOR, STRIKE AND HINGE SIDES). DOOR HARDWARE EXCLUDED. 9. PREPARATION AT BUILDING FOUNDATIONS AGAINST LANDSCAPED AREAS TO PREPARE FOR A COMPLETE PAINT COVERAGE. 10. WOOD SHED INCLUDED IN SCOPE OF WORK TO BE PAINTED 11. N/A 12. 3-DIMENSIONAL LETTERS OF THE SCHOOL NAME TO BE PAINTED. 13. REMOVE OF ALL SIGNAGE INCLUDING DOOR AND ADA SIGNAGE AND RE-INSTALL UPON COMPLETION OF FINISH WORK WITH VANDAL PROOF SCREWS. 14. PAINT STAIR RISERS, STRINGERS, AND THREADS 15. (E) BUILDINGS REGLETS ARE NOT TO BE PAINTED 16. N/A 17. (E) BUILDING LOUVER VENT BLADES TO BE STRAIGTHENED AND RE-PAINTED. 18. (E) METAL FASCIA TRIM TO BE RE-FINISHED. Bid Result : PROPOSAL MARSHALL - Perfection Painting - $ 191,000.00 VISTA HS - Color New Co - $ 156,200.00

Award

Educational

$191,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
109
Bidding Soon
2,297
All Active Projects
899
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2024

June 11, 2024

img_map_placeholder

Multiple Locations, Lynwood, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.