Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a bridge / tunnel in Kingston, Oklahoma. Conceptual plans call for site work for a bridge / tunnel.
The Roosevelt Bridge Project will construct a new multimodal bridge across Lake Texoma on a new alignment south of the existing bridge. The new bridge will have a total length of 10,625 feet and consist of 72 spans. The superstructure will be made of prestressed concrete girders that will support a concrete deck. The substructure will consist of multi-column piers with 10-foot diameter drilled shafts that will be founded on bedrock. The bridge will have four lanes of traffic with 10-foot shoulders on each side and a median barrier to separate the directions of travel. The bridge will also have lighting fixtures to enhance visibility and safety at night. In addition, the Project will include multimodal accommodations for cyclists and pedestrians, such as a barrier separated path. US-70 between State Park Road and Willow Springs Road will be widened to a five-lane section (two driving lanes in each direction and center turn lane) to provide continuity with the sections to the east and west. Turn lanes will be provided where needed at intersections, and a traffic signal and crosswalk are anticipated at the State Park Road intersection to accommodate traffic from adjacent development. The new bridge will still be connected to Highway 70. It will be built further south than the current bridge. The current bridge won’t be demolished but it is unknown what it will be used for. ODOT is still working on the funding source for the new bridge, and it is estimated to cost between $150-250 million. As of July 15, 2024, Environmental planning Spring 2026. Design is planned for Spring 2028. Right-of-Way planned for Summer 2028. Construction let date 2029.Estimated completion date is to be determined.
Conceptual
Bridges / Tunnels
$250,000,000.00
Public - State/Provincial
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2029
US-70, Kingston, OK
Related To This Project
Kingston, OK
Bid Date: Jul 30 2024
Kingston, OK
Bid Date: Feb 16 2024
Kingston, OK
--
Kingston, OK
--
Kingston, OK
--
Kingston, OK
Bid Date: Sep 28 2023
Kingston, OK
--
Kingston, OK
--
Kingston, OK
Bid Date: Dec 15 2021
Kingston, OK
Bid Date: Jul 06 2022
Kingston, OK
Bid Date: Apr 19 2022
Ada, OK
Bid Date: May 21 2024
Tulsa, OK
Bid Date: May 10 2024
Taft, OK
Bid Date: May 09 2024
Oklahoma City, OK
Bid Date: Apr 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.