BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2024 at 7:00 PM

Updated December 3, 2024

Site work and new construction of an educational facility in Bastrop, Texas. Completed plans call for the construction of a 106,375-square-foot, two-story above grade educational facility.

*As of December 12, 2024, project is under construction; it broke ground back in October 2024, and is expected to open in the Fall of 2025.* American Constructors is the Construction Manager-at-Risk for the Bastrop ISD Elementary #9 school (Pkg 2): All Trades. The project is a new 106,375 square foot, 2-story tilt wall building. The floor plan consists of primarily insulated tilt wall exterior construction with some metal stud framing. Exterior finish consists of thin brick, concrete form liner patterns, metal wall panels and brick/stone veneer. Project Address: TBD - Adelton Development near Hwy 21 & Hwy 20 **This package EXCLUDES work previously bid & awarded for electrical switchgear purchase and structural steel materials. Estimated start date is May/June 2024 with completion date of June/July 2025. **Total Project Value listed as estimate Please contact American Constructors at (512) 328-2026 for additional information on this project. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Under Construction

Educational

$23,000,000.00

Public - City

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
333
Active Projects
89
Bidding Soon
2,947
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2024

October 1, 2024

Project location map

To Be Determined, Bastrop, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.