BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and asbestos abatement for a municipal facility in Conway, South Carolina. Completed plans call for the demolition of a municipal facility; for site work for a municipal facility; and for asbestos abatement for a municipal facility.

Asbestos abatement and demolition of a +/- 10,000 sq. ft. building which is owned by the City of Conway. Scope of Work 1. The contractor shall provide all equipment, materials, tools, and labor required for abatement and demolition work at the above-referenced site. All building materials, including the slab and adjoined sidewalks, shall be removed from the site and taken to a DHEC-approved landfill. 2. A chain link fence surrounding the building shall be removed and salvageable materials left on site for removal by the City, if possible. 3. A communications tower in the rear of the building shall be laid on its side intact and left on the property for preservation and removal by the City at a later date. 4. If asbestos abatement is completed prior to the demolition of the building, the contractor should take care to preserve and leave on site as many whole bricks from the buildings exterior as possible. 5. The contractor will see that all materials removed from the site are legally placed in a landfill. Landfill receipts will be provided to the City of Conway prior to the final payment. The contractor relieves the City of Conway from any liability related to the removal of debris. 6. The contractor shall be responsible for acquiring all appropriate licenses and permits related to asbestos abatement and demolition. The contractor shall contract with a DHEC-licensed asbestos project designer for a project design prior to the City of Conway issuing a notice to proceed. 7. The City of Conway shall be responsible for all utility disconnections; however, the contractor shall ensure that any utilities on the property are properly marked and disconnected prior to beginning work. 8. If the contractor finds any in-ground liquids, sludges, tanks, or hazardous materials, the contractor will sub-contract with an appropriate professional or firm to appropriately dispose of such materials. 9. The Contractor shall perform all work in conformance with applicable local codes and DHEC requirements whether or not covered herein by the specifications for the work. 10. During the project, periodic inspections may be conducted by the City to ensure compliance with the requirements of the contract and specifications. 11. Contractor will be responsible for insuring proper asbestos monitoring during all abatement activities.

Bid Results

Municipal

$187,300.00

Public - County

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
52
Bidding Soon
533
All Active Projects
229
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2024

June 6, 2024

img_map_placeholder

To Be Determined, Conway, SC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.