Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Austin, Texas. Working plans call for site work for a water / sewer project.
With this Request for Proposal (RFP), MGC Contractors, Inc. is advertising to retain highly qualified, capable firms to propose on the CMAR, Work Packages as indicated below, for Guaranteed Maximum Price (GMP-2), for the Walnut Creek WWTP Primary Clarifier and Flow Equalization Basin Rehabilitation Project. The bid documents will be available to the contracting and vendor community online in the virtual Civcast plan room (Civcastusa.com), as well as local periodicals yet to be determined. The Bid Advertisement is tentatively planned to be the second or third week of May, and will be updated in this project listing once a definitive date is scheduled. The Bid Period is anticipated to run for six (6) to seven (7) weeks and will also be determined in the near future. All times in this GMP-2, RFP are Central Standard Time (CST). MBE/WBE/DBE Certified Firms are strongly encouraged to bid. All qualified applicants will receive consideration for employment or award without regard to race, creed, color, religion, national origin, sexual orientation, gender identity, disability, veteran status, sex or age. The following Scopes of Work will be included in GMP-2: Demolish and replace Isolation Slide Gates in headworks splitter box 2, as will be shown and specified in the 100% IFC Construction Documents Demo and replace Existing PTC & FEB Equipment, Measure, Purchase & Install PTC & FEB Equipment for PTC 1 and PTC 2, consisting of trains 1, 2, 3 and 4. Construction of an interconnect channel between PTC 1 and PTC 2 Purchase & Install Slide Gates per the 100% IFC Construction Documents Install pre-purchased Emergency By-Pass Pumps and Purchase and Install By-Pass HDPE Pipe per 100% IFC documents Hazardous Material Abatement - Terracon Concrete Repair & Restoration via the City Of Austin Contractor Allowance per the 100% IFC documents By-Pass Pump Preventative Maintenance and Fuel Delivery Allowance
Final Planning
Water / Sewer
$3,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 22, 2024
7113 FM 969, Austin, TX
Related To This Project
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: May 02 2019
Austin, TX
--
Austin, TX
Bid Date: Jun 07 2024
Austin, TX
--
Austin, TX
--
Austin, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.