Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 14, 2025 at 8:00 PM

Updated August 15, 2025

Site work for a bridge / tunnel in San Antonio, Texas. Design plans call for site work for a bridge / tunnel.

Construction of concrete box culverts at the Heuerman Rd and Maverick Creek Tributary 6 low water crossings. As of August 14, 2025, this project has been delayed due to environmental constraints and is still in design. Information regarding a general contractor has not been released. Construction is expected to begin in the second quarter of 2026.

Design

Bridges / Tunnels

$1,500,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
77
Bidding Soon
2,969
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed