Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a mixed-use development in Dallas, Texas. Completed plans call for the demolition of a transportation facility; for the construction of a transportation facility; for site work for a transportation facility; for paving for a water / sewer project; water / sewer project; water / sewer project; and transportation facility.
https://www.wfaa.com/article/travel/dfw-airport-opens-renovated-runway-ahead-summer-travel-rush/287-29861a8d-d5f7-4fa8-a928-78c67af68b27 DFW Airport re-opens newly-renovated runway ahead of summer travel rush The runway was closed for about nine months as part of a capital improvement program to invest $9 billion into expansions and facilities at the airport over time. Credit: Jake Dean via DBJ Author: Rachel Snyder Published: 9:29 PM CDT May 31, 2024 Updated: 9:29 PM CDT May 31, 2024 Facebook FORT WORTH, Texas — Dallas Fort Worth International Airport re-opened a 200-foot-wide runway that was being worked on ahead of schedule before the summer travel rush gets underway. Runway 17R/35, the largest of DFW Airport’s seven runways, was closed for nine months as part of an ongoing capital improvement program to invest $9 billion into expansions and facilities at the airport over the next five years. Other projects part of the program include the complete rebuild of Terminal C and the construction of a new Terminal F. The runway is reopening in phases and will fully reopen later this year. It features 2,680,000 square feet of new runway surface, which is equivalent to 570 NBA basketball courts. “The innovative approach to phased construction and a partial reopening allows crews to simultaneously finish the remaining work while safely bringing back into service what is normally one of the busiest departure runways for aircraft to use during the peak travel season,” said Mohamed Charkas, Executive Vice President of Infrastructure and Development at DFW. “This project is another example of how DFW is leveraging innovative construction techniques to reduce costs and operational impacts while delivering exceptional infrastructure for our partners and the traveling public.” It's the third runway at the airport to undergo complete rehabilitation in the last seven years. The newly-reconstructed runway features a high-density asphalt overlay, improved drainage, electrical infrastructure, and lighting including 2,725 runway lights that were replaced with LED lights, signage, and more. There’s also a new lighting vault to power the east airfield that replaces a previous 50-year-old lighting vault that was near Terminal A. Earlier this year, DFW Airport was awarded a $45 million Airport Infrastructure Grant under the Bipartisan Infrastructure Law by the U.S. Department of Transportation’s Federal Aviation Administration to assist in funding the runway project. __________________________________________________________ This will be a Lump Sum contract. The independent estimate for this project is: $135,658,375.00. Minority/Women Business Enterprise (M/WBE) GOAL: 15% Construction Services. This contract will fall under ROCIP. Total Contract Duration 690 calendar days (Substantial Completion of 600 days with an additional 90 consecutive calendar days for Final Completion). To enhance the opportunity for a successful RFB submission, the Airport highly encourages a representative from your company that will complete bidding documents including MWBE forms and submittals for the bid, proposal or statement of qualifications to attend all pre-bid, pre-proposal or pre-qualification statement meetings. Cone of Silence - To ensure a proper and fair evaluation, the DFW International Airport has established a cone of silence applicable to all Competitive Selection Processes, including RFQs, RFPs and RFBs. The cone of silence is designed to protect the integrity of the procurement process by shielding it from undue influences. The cone of silence will be imposed on all Competitive Selection Processes beginning with advertisement for the same and ending with the Board's selection for RFQs, RFPs or the Board's award for a RFB. The Cone of Silence begins when the solicitation is advertised/released and ends after the contract/purchase order is awarded, noting that release of some information is restricted by law. Potential bidders/proposers shall not discuss any aspect of a released solicitation with Airport personnel with exception to the contract administrator/ buyer listed in the solicitation. Deadline to submit Questions May 9th 2024, 4:00 PM CDT Contact Information: James Legerme, jlegerme@dfwairport.com
Bid Results
Transportation Terminals
$3,782,827.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 13, 2024
September 16, 2024
2400 Aviation Dr, Dallas, TX
Related To This Project
Dallas, TX
--
Dallas, TX
Bid Date: Sep 05 2024
Dallas, TX
Bid Date: May 22 2024
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Apr 22 2024
Dallas, TX
Bid Date: Apr 30 2024
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: May 17 2024
Dallas, TX
--
Dallas, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.