BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Tupper Lake, New York. Completed plans call for the renovation of a residential development.

CR Number: 2109153 OPWDD is soliciting quotes from responsible and qualified MWBE, SDVOB or NYS small business contractors to provide interior preparation and painting service to Sunmount DDSO, at 48 St Lawrence in RIT 2 This procurement opportunity is limited to New York State Small Businesses, New York State businesses certified pursuant to Articles 15-A and 17-B of the New York State Executive Law - Empire State Development Corporation Certified Minority or Woman Owned business (MWBE) or New York State Office of General Services Service-Disabled Veteran-Owned Business (SDVOB) only. Please provide a copy of your firm's certification documents when submitting a quote. Service-Disabled Veteran-Owned Set Aside: No Contract term: 1 year County(ies): All NYS counties Location: Sunmount DDSO 2445 State Route 30 Tupper Lake, NY 12986 Prepare interior, then paint all surfaces. The vendor shall provide all Materials and labor necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project, and prevailing wages are to be paid. Certified Payrolls must be submitted at time of completion. Refer to attached specification for the following scope of work if supplied. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no materials or equipment, are to be left unsecured. Upon completion of interior/exterior house and outbuildings painting, before removal of equipment, contractor is to schedule a quality control and quality assurance inspection with Maintenance Supervisor 2, Max Gerstenberger. SCOPE OF WORK includes, but is not necessarily limited to the following: 1. Patch and prepare all interior walls. 2. Prime Interior Walls. 3. Prepare all interior trim and woodwork. 4. Paint interior walls with 2 coats of interior paint. Colors to be decided by OPWDD staff. 5. Refinish all interior trim and woodwork to match original finishes. 6. All work is to be performed by OSHA standards. 7. All paint debris must be cleaned up by Contractor. 8. Follow Part 2 and Part 3 in General Requirements. 9. Project includes all rooms in home except 4 bathrooms. All questions or requests for information must be submitted in writing to max.l.gerstenberger@opwdd.ny.gov.

Post-Bid

Residential Subdivision

$100,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
49
Bidding Soon
742
All Active Projects
311
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 29, 2024

July 1, 2024

July 1, 2025

img_map_placeholder

2445 NY-30, Tupper Lake, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.