BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Orlando, Florida. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for outdoor lighting for a road / highway.

Counties: Orange Road Name: SR 500 (Orange Blossom Tr) Limits: From 39th St to W Gore St Project(s): 43757515201(*) Federal Aid No: D524020B Project(s): 43757515202 Federal Aid No: N/A Total Roadway Length: 1.292 Miles Contract Days: 160 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.292 Miles Contract Execution Days: 10 Day Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Description: Orange Blossom Trail Phase 2a From 30th Street to Gore Street - Sidewalk The Improvements Under This Contract Consist of Sidewalk, Pedestrian Improvements and New Bus Pad Improvements Along Sr 500 (Obt) From 30th Street to W. Gore Street. (Mp 11.338 to 12.630). The Proposed Improvements Include Decorative Banding in The Sidewalk, Pedestrian Signal Upgrades, Lighting, and Upgrading Michigan Street and Grand Street From Strain Pole to Mast Arm Control. Award Contingency Upon Receipt of Local Funds. Question Deadline 05/15/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 013: Sidewalk / Traffic Signals / Lighting / Drainage Improvements - SR 500

Award

Roads / Highways

$3,278,993.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

166

3

3

5

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
75
Bidding Soon
1,379
All Active Projects
583
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.