BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Boston, Massachusetts. Working plans call for site work for a water / sewer project.

This project has been cancelled. Please follow for future updates. The work includes the removal, disposal, and replacement of six fuel storage tanks at Caruso Pump Station (one tank), Delauri Pump Station (one tank), Framingham Pump Station (one tank) New Neponset Valley Pump Station (one tank) and Cottage Farm CSO (two tanks). Unless otherwise noted, all replacements will include piping connections from storage tanks to day tanks systems, fuel transfer systems, day tank systems, upgraded leak detection and tank monitoring systems. This contract is subject to a 7.24% MBE and a 3.6% WBE participation requirement The estimated project cost is: $3,968,037.00. A. Caruso Pump Station: Furnish all labor, materials, equipment, and incidentals necessary to perform the following items of Work as indicated in the Contract Documents and on the Contract Drawings and as specified: 1. Instrumentation and monitoring of existing structures and utilities within 50 feet of tank replacement activity. 2. Removal of existing underground fuel storage tank. 3. Removal of existing fuel piping. 4. Removal of existing fuel monitoring equipment. 5. Installation and removal of temporary fuel tank and fuel piping. 6. Maintenance and filling of temporary fuel tank. 7. Installation of new underground fuel storage tank. 8. Installation of new fuel piping. 9. Installation of new fuel monitoring equipment. B. Cottage Farm CSO Facility: Furnish all labor, materials, equipment, and incidentals necessary to perform the following items of Work as indicated in the Contract Documents and on the Contract Drawings and as specified: 1. Removal of two (2) existing underground fuel storage tanks. 2. Removal of existing fuel piping to the building only. 3. Installation and removal of temporary fuel tank and fuel piping. 4. Maintenance and filling of temporary fuel tank. 5. Installation of two (2) new underground fuel storage tanks. 6. Installation of new fuel piping to the building only. 7. Contractor to be aware that abatement work by others at the Main Building may be ongoing during construction of improvements. While there are not direct impacts anticipated, coordination will be required with the Owner in accordance with requirements of Section 01015. C. DeLauri Pump Station: Furnish all labor, materials, equipment, and incidentals necessary to perform the following items of Work as indicated in the Contract Documents and on the Contract Drawings and as specified: 1. Instrumentation and monitoring of existing structures and utilities within 50 feet of tank replacement and trench activity. 2. Removal of existing underground fuel storage tank. 3. Removal of existing fuel piping. 4. Removal of existing engine generator day tank. 5. Removal of existing fuel transfer pump set. 6. Removal of existing fuel monitoring equipment. 7. Removal of MassDEP UCL exceedance soil, 8. Installation and removal of temporary fuel tank, day tank(s) and fuel piping. 9. Maintenance and filling of temporary fuel tank. 10. Installation of new underground fuel storage tank. 11. Installation of new fuel piping. 12. Installation of new engine generator day tank. 13. Installation of new boiler day tank. 14. Installation of new fuel transfer pump set. 15. Installation of new fuel monitoring equipment. D. Framingham Pump Station: Furnish all labor, materials, equipment, and incidentals necessary to perform the following items of Work as indicated in the Contract Documents and on the Contract Drawings and as specified: 1. Instrumentation and monitoring of existing structures and utilities within 50 feet of tank replacement and trench activity. 2. Removal of existing underground fuel storage tank. 3. Removal of existing fuel piping. 4. Removal of existing engine generator day tank. 5. Removal of existing fuel transfer pump set. 6. Removal of existing fuel monitoring equipment. 7. Installation and removal of temporary fuel tank, day tank(s) and fuel piping. 8. Maintenance and filling of temporary fuel tank. 9. Installation of new underground fuel storage tank. 10. Installation of new fuel piping. 11. Installation of new engine generator day tank. 12. Installation of new fuel transfer pump set. 13. Installation of new fuel filtration skid. 14. Installation of new fuel monitoring equipment. E. New Neponset Valley Pump Station: Furnish all labor, materials, equipment, and incidentals necessary to perform the following items of Work as indicated in the Contract Documents and on the Contract Drawings and as specified: 1. Instrumentation and monitoring of existing structures and utilities within 50 feet of tank replacement and trench activity. 2. Removal of existing underground fuel storage tank. 3. Removal of existing fuel piping. 4. Removal of existing engine generator day tank. 5. Removal of existing fuel transfer pump set. 6. Removal of existing fuel monitoring equipment. 7. Installation and removal of temporary fuel tank, day tank(s) and fuel piping. 8. Maintenance and filling of temporary fuel tank. 9. Installation of new underground fuel storage tank. 10. Installation of new fuel piping. 11. Installation of new engine generator day tank. 12. Installation of new fuel transfer pump set. 13. Installation of new fuel filtration skid. 14. Installation of new fuel monitoring equipment. F. Contractor to remove and dispose of existing fuel found in tanks and pipes. Assume that all tanks will be 50% full and all pipes being removed, or draining back to items being removed and downstream of means of isolation, are completely full. Total assumed value of fuel to be removed and disposed of 32,700 gallons.

Final Planning

Water / Sewer

$3,968,037.00

Public - State/Provincial

Site Work

86

11

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
538
Active Projects
334
Bidding Soon
4,201
All Active Projects
1,712
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 15, 2024

January 13, 2025

July 15, 2026

img_map_placeholder

Multiple Locations, Boston, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.