Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Billings, Montana. Contact the soliciting agency for additional information.
The City of Billings is requesting proposals for the development of a 21st Street Underpass Safety, Roadway, and Multi-Modal Access Improvement Study, for the Planning & Community Services Department, Billings, Montana. Proposers may withdraw their proposal by written request at any time prior to the due date set for receiving proposals. No proposal may be withdrawn or modified after the due date and time, unless and until the award of the contract is delayed for a period exceeding ninety (90) days. The right is reserved to reject any or all proposals received, to waive irregularities, to postpone the award of the contract for a period of not to exceed ninety (90) days, and to accept that proposal which is in the best interests of the City of Billings, Montana. Award of any contract may be contingent upon approval by Billings City Council. The City of Billings is an Equal Opportunity Employer. The Contractor and subcontractor shall abide by the requirements of 41 CFR 60-300.5(a) and 41 CFR 60-741.5(a), which prohibit discrimination against qualified protected veterans and/or qualified individuals on the basis of disability, and requires affirmative action by covered prime contractors and subcontractors to employ and advance in employment qualified protected veterans and individuals with disabilities. Proposal Acceptance Period Award of this proposal is anticipated to be announced within forty-five (45) calendar days, although all offers must be completed and irrevocable for ninety (90) days following the submission date. Questions Questions regarding the Request for Proposals contents must be sent to the contact person listed in Section 1 no later than 2 business days prior to due date for proposals. The City will make every effort to provide a written response within 2 business days. Whenever responses to inquiries would constitute a modification or addition to the original RFP, the reply will be made in the form of an addendum to the Request for Proposals, a copy of which will be posted on the City's website. Scope of Work 3.1. Project Overview: The primary objective of this project is to assess and enhance the safety, multimodal accessibility, and roadway conditions of the 21st Street Underpass, serving as a critical connection during train usage. The project aims to identify strategies for improving the underpass to ensure the safety of all users, both motorized and non-motorized. Additionally, the project will involve close collaboration with BNSF Railroad to implement necessary improvements. 3.2 Scope of Work 1. Project Initiation and Planning: o Conduct a kickoff meeting with stakeholders, including representatives from Montana Department of Transportation, City of Billings, and BNSF Railroad, and others deemed vital. o Develop a project process outlining the project's scope, objectives, deliverables, and timeline. o Establish a project team and assign responsibilities. o Review existing documentation, plans, and safety records related to the underpass. 2. Data Collection and Analysis: o Conduct a thorough field review of the underpass, analyzing current safety conditions, signage, lighting, and visibility. o Evaluate traffic flow and patterns. Include existing traffic count information and a count of traffic during train activity at the 27th Street crossing. o Identify existing and potential safety hazards and areas of concern. 3. Stakeholder Engagement: o Establish regular communication channels with BNSF Railroad to understand their operational requirements and constraints. o Conduct public outreach and community engagement activities to gather input on safety concerns and improvement priorities. o Engage with local law enforcement and emergency services for insights into safety issues. 4. Safety Improvement Strategies: o Develop a safety improvement plan for the underpass based on data analysis and stakeholder input. o Propose roadway design solutions to enhance safety, including improved lighting, signage, and non-motorized access. o Consider advanced technologies for real-time monitoring of underpass conditions. 5. Multi-Modal Accessibility: o Evaluate the underpass's current accessibility for both motorized and non-motorized users. o Propose improvements to accommodate pedestrians, cyclists, and other non-motorized transportation modes. o Consider enhancements such as widened pathways, bike lanes, and ADA-compliant features. 6. Roadway Improvements: o Assess the condition of the roadway leading to and from the underpass. o Propose roadway improvements, including pavement rehabilitation, intersection upgrades, and traffic flow optimization. o Ensure compatibility with existing and future transportation plans. 7. Coordinated Planning with Railroads: o Collaborate closely with BNSF Railroad to understand their scheduling, operational needs, and safety requirements during train usage. o Identify necessary permissions and approvals for proposed improvements. 8. Planning Level Financial Planning: o Utilize $7,400 of total project funds designated by the MPO for Safe and Accessible Transportation Options Planning Activities. o Develop a planning level budget for the project, including cost estimates for safety, multimodal, and roadway improvements. o Explore additional funding sources and grant opportunities. 9. Regulatory Compliance and Permitting: o Ensure that all proposed improvements comply with local, state, and federal regulations. o Identify the permitting process for construction and modifications. 10. Draft Study: o Develop a phased implementation plan based on prioritized improvements and coordination with railroad schedules. o Establish timelines for each phase of implementation. o The consultant needs to expect a preliminary study review phase, during which the steering committee and other stakeholders will provide feedback and suggestions for corrections. 11. Final Draft Study/Review Schedule: o The consultant should be prepared to engage in the Transportation Planning Process, which involves reviewing and approving documents. This schedule encompasses up to five project presentations to various entities such as the Technical Advisory Committee (TAC), Planning Board, City Council (work session), Board of County Commissioners, and the Policy Coordinating Committee (PCC).
Conceptual
Roads / Highways
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 14, 2024
21st St W, Billings, MT
Related To This Project
Billings, MT
--
Billings, MT
Bid Date: May 21 2024
Billings, MT
Bid Date: May 24 2024
Billings, MT
Bid Date: Jun 07 2024
Billings, MT
Bid Date: Jun 20 2024
Billings, MT
Bid Date: Jun 18 2024
Billings, MT
Bid Date: Jul 18 2019
Billings, MT
Bid Date: Jun 24 2024
Billings, MT
Bid Date: Jun 04 2024
Billings, MT
Bid Date: Jun 04 2024
Billings, MT
Bid Date: Oct 29 2024
Billings, MT
--
Billings, MT
Bid Date: May 07 2024
Billings, MT
Bid Date: Apr 16 2024
Billings, MT
Bid Date: May 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.