BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Missoula, Montana. Working plans call for the construction of a municipal facility; and for site work for a municipal facility.

** As of June 7, 2024 the owner has determined a prequalified list of construction managers.'' Deadline for Questions: May 10, 2024, at 5:00 PM MDT Upon release of this solicitation document, all communications concerning this procurement must be directed to: Frank Kuhl Procurement and Contracts Specialist Missoula Urban Transportation District 1221 Shakespeare St, Missoula, MT 59802 fkuhl@mountainline.com 406-543-8386 OR Colin Woodrow Missoula Urban Transportation District 1221 Shakespeare St, Missoula, MT 59802 cwoodrow@mountainline.com 406-544-6688 Disadvantaged Business Enterprise Participation The Disadvantaged Business Enterprise (DBE) requirements of 49 CFR Part 26 apply to this contract. The requirements of this contract are to encourage DBE participation and to report race neutral accomplishments semi-annually. No preference will be included in the submission evaluation, no minimum level of DBE participation shall be required as condition for receiving an award and submissions will not be rejected or considered non-responsive on that basis. SCOPE OF WORK 2.1. General MUTD is soliciting proposals from interested firms/contractors for Construction Manager at Risk services, where the basis of payment is the Cost of Work Plus a Fee with a Guaranteed Maximum Price. The Construction Manager at Risk (CMAR) will team with MUTD's Project Manager and Architect/Engineer (Wendel Architects) to successfully design and construct the proposed new Missoula Urban Transportation District Operations and Maintenance Facility, to be located at West Broadway/Whippoorwill Dr. Missoula, Montana. 2.2. Background MUTD is Missoula's community transit service and is governed by a seven-member board of directors. MUTD is the direct recipient of FTA funding for Missoula Montana. MUTD's service area population does not exceed 100,000 people. The agency provides hourly fixed-route service, seven days per week, on twelve routes as well as paratransit ADA services. MUTD's fleet consists of thirty (30) vehicles housed in a gated, fenced yard at the current operations facility. Bus storage yard has been expanded once and cannot be expanded any more. 2.3. Project Description MUTD is undertaking the design and construction of a new Maintenance Operations and Administrative Building (MOAB) located at West Broadway/Whippoorwill Drive in Missoula, Montana. The project is proposed to be constructed on a 10 to 20-acre parcel that will allow for substantial growth of the MUTD fleet and facility needs for the foreseeable future. The tract MUTD is currently considering is 18.5 acres. The MOAB will include administrative, operations, and maintenance functions that will replace the existing facility which has proven to be too small as MUTD grows. The new facility will include the following spaces as generally allocated with the plan: Administrative - 3,000 SF Operations - 7,000 SF Maintenance - 15,000 SF Service - 4,000 SF Bus Storage - 30,000 SF The total facility will be approximately 60,000 SF. These quantities are estimates only and will change throughout the design process. In addition to the building, the project will be designed ultimately for approximately eighty-four (84) bus parking spaces with approximately thirty (30) being built in this initial phase. Employee and visitor parking will equal approximately 206 spaces with 127 spaces initially built. Parking for the buses, including all circulation space, is anticipated to be concrete while employee parking will be typical asphalt. The project includes grading of the site, possible borrow or fill material, facilities, and all equipment needed for both conditioning of the space and mission specific to transit operations and maintenance. MUTD currently has a mixed fleet of diesel and battery electric buses. The project will be designed for one hundred percent (100%) battery electric buses with appropriate backup generation in the event of an incident where power may be lost for an extended period of time.

Final Planning

Municipal

$93,050,000.00

Public - City

New Construction, Site Work

4

5

6

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
5
Bidding Soon
56
All Active Projects
32
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2024

August 5, 2024

img_map_placeholder

W Broadway St, Missoula, MT


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.