Site work for a water / sewer project in Rocky Comfort, Missouri. Completed plans call for site work for a water / sewer project.

The Section 1 work to be performed consists of site grading for the construction of an elevated water storage tank, installation of 52 LF of 8" diameter P.V.C. and 24 LF of 10" diameter P.V.C. water line and appurtenances, well house electrical improvements, and SCADA system. The Section 2 work to be performed consists of the construction of a 250,000-gallon elevated multi-leg type water storage tank and associated foundations, minor yard piping and appurtenances, tower electrical work, and rough site grading. BIDDER hereby agrees to commence work under this contract on or before a date to be specified in the NOTICE TO PROCEED, and to fully complete the PROJECT within 270 consecutive calendar days thereafter. The work consists of furnishing all labor, materials, equipment, testing, tools, and supervision to complete the 250,000- gallon elevated water storage tank, site work, site piping, electrical, and all incidentals, as described in the specifications, and as shown on the drawings. SUMMARY OF WORK 5.1 The Section 1 work to be performed under this contract generally consists of the site grading, well house SCADA and electrical improvements, and installation of 52 LF of 8-inch and 24 LF of 10-inch diameter water line and appurtenances to create a complete and functioning system. 5.1.1 Add alternate Bid Item prices shall be received for the (1) replacement and painting of piping within Wellhouse No. 2 and (2) replacement and painting of the well head assembly. See construction drawings and Section 01 35 13, SPECIAL PROJECT CONDITIONS for additional details. 5.2 The Section 2 Contractor shall be responsible for the construction of the 250,000-gallon elevated storage tank and foundations, as well as water lines and electrical attached to and extending 10-feet from the tank center column. 5.3 Inclusive in the work is close coordination with all appropriate jurisdictional agencies and responsibility for construction standards, traffic control, and safety requirements of these agencies. Bid Result - Section 1 (Water Line) - Dirks Heavy Contractors, LLC - $ 282,074.00 Section 2 (Elevated Water Storage Tank) - Caldwell Tanks, Inc. - $ 1,241,700.00

Bid Results

Water / Sewer

$1,523,774.00

Public - County

Site Work

13

16

2

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
25
Bidding Soon
532
All Active Projects
235
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

July 22, 2024

img_map_placeholder

To Be Determined, Rocky Comfort, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.