BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 15, 2025 at 8:00 PM

Updated May 16, 2025

Site work, renovation and addition to a mixed-use development in Barre, Vermont. Completed plans call for the addition of a 1,800-square-foot pre-engineered storage facility; and for the renovation of a one-story above grade office development.

As of May 15, 2025, construction is underway. All trades have been awarded. *The closed solicitation has been included below for reference: Central Vermont Solid Waste Management District and Wiemann Lamphere Architects, Inc. are seeking proposals of contractors for Construction Management (CM) services. The project will consist of an addition to an existing pre-engineered metal building structure used for equipment storage, and a renovation to a small administrative office on the same site. The Construction Manager (CM) will take the Engineering Plans and secure contract vendors to successfully complete the project within the project construction schedule, and is expected to work with the design team and work force to optimize the design for cost, constructability, and product availability. The project will consist of an addition to an existing pre-engineered metal building structure used for equipment storage, and a renovation to a small administrative office on the same site. The site has existing municipal water service, municipal wastewater & electrical service at the location. Improvements will be required to those systems which will be managed by CVSWMD independently. The addition for the HHW facility will be 1,800 SF (see attached plans). The renovation to a single-story wood frame building (with basement) will also be required to support the operational requirements of the CVSWMD. Question Deadline 05/03/2024 at 12:00 PM ET

Under Construction

Warehouse / Distribution - Pre-Engineered Storage Building

$1,000,000.00

Public - City

Addition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
63
Bidding Soon
779
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2024

October 7, 2024

Project location map

300 Granger Rd, Barre, VT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.