BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Jackson, Tennessee. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Project scope includes Bid Item #1 Off Site Improvements Jackson Madison County Schools is an equal opportunity employer and does not discriminate in any way. Jackson Madison County Schools & Henson Construction Services reserve the right to reject any or all Bids, to waive any informality in the Bidding and to award on the basis of the Lowest and Best Bid, as determined by Jackson Madison County Schools & Henson Construction Services. *Estimated value shown is for entire New Pope Pre K-8 School Project up to and including the Off Site Improvements. 1. All Work shown on the Plans by Orcutt/Winslow and Clay Williams & Associates, Inc. C-204, C-205, C-206, C-305 & C-506 all dated June 29, 2023. 2. Contractor shall confirm all elevations prior to construction and shall be responsible for providing all line, grade and stakeout for the construction of this project. 3. All existing utilities shown both above and below ground are approximate and are not necessarily all that exist. The determination of the existence and location of all utilities shall be the responsibility of the contractor to field verify. 4. All items of work (grading, drainage, base, paving, etc.) shall be constructed and tested in accordance with the Tennessee Department of Transportation, Standard Specifications for Road and Bridge Construction, dated January 1, 2021 along with all applicable Standard Drawings and Special Provisions. 5. All disturbed areas not to receive concrete, paving, sod, landscape, etc. are to be seeded and mulched. 6. The Contractor shall prepare all documents necessary for receiving an NPDES permit for construction storm water discharge, implement an effective erosion control plan, document the effectiveness of the plan and adjust the plan as necessary. The Contractor is responsible for obtaining any and all local permits which are required. Design, Implementation, Inspections, Reporting and Maintenance of Erosion Control is to be included. 7. Contractor is responsible for all Testing (compaction, moisture content, etc.) as required per TDOT specifications. All reports and results shall be sent to Engineer, Owner and Construction Manager. 8. A required Temporary Traffic Control Measures are to be included by Bidders. 9. Bidding Contractors to take into account, anticipate and accommodate for any possible material price increases which may affect their Bid and/or cost during the extent of the project duration. 10. Neither the Owner, CM nor its representatives are responsible for receiving, signing, transporting, care or safe keeping of any materials provided by any Contractor.

Post-Bid

Educational

$35,000,000.00

Public - County

New Construction, Site Work

7

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
31
Bidding Soon
424
All Active Projects
183
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2024

June 3, 2024

img_map_placeholder

1081 Ashport Rd, Jackson, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.