BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Lutz, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Counties: Hillsborough Road Name: SR 93 (I-275) Limits: From Sr 93 (I-275 / Frontage Rd Exit Ramp at Doyle Cartlon Dr) to E of N Tampa St Project(s): 45287715201(*) Federal Aid No: D724027B Total Roadway Length: 0.143 Miles Contract Days: 175 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.143 Miles Contract Execution Days: 10 Day Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Description: The Improvements under this Contract consist of the design of a new wide sidewalk from I-275/SR 93/SB Frontage Road Exit Ramp at Doyle Carlton Drive to East of North Tampa Street, proposed lighting for the wide sidewalk, a raised crosswalk on Doyle Carlton Drive near the Art Center Lofts entrance, a speed table on Doyle Carlton Drive, and a pedestrian crossing at the threeway, stop-controlled intersection of the I-275/SR 93/SB Frontage Road Exit Ramp and Doyle Carlton Drive. The project is located in Hillsborough County. Question Deadline 05/15/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 023: Sidewalk / Drainage Improvements / Lighting / Milling and Resurfacing

Award

Roads / Highways

$1,109,387.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

70

6

6

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
347
Active Projects
148
Bidding Soon
2,584
All Active Projects
1,052
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 22, 2024

June 1, 2024

November 23, 2024

img_map_placeholder

I-275 & FL-93, Lutz, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.