BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 19, 2024 at 8:00 PM

Updated June 20, 2024

Site work, paving and outdoor lighting for a mixed-use development in Clearwater, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Counties: Pinellas Road Name: SR 55 (US 19) Limits: From S of Cr 528 (Drew St) to N of Cr 576 (Sunset Point Rd) Project(s): 44378015201(*) Federal Aid No: D724009B Total Roadway Length: 6.257 Miles Contract Days: 325 Total Bridge Length: 0.000 Miles Total Proposal Length: 6.257 Miles Contract Execution Days: 10 Day Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Description: The Improvements under this Contract consist of milling and resurfacing, realigning existing u-turn lanes, sidewalk improvements to comply with the Americans with Disabilities Act, and lighting upgrades along US 19 (SR 55) from S of CR 528/Drew St to N of CR 576/Sunset Point Rd. in Pinellas County. Question Deadline 05/15/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 024: Resurfacing / Drainage Improvements - US 19 (SR 55) Project no-15150-3566

Award

Roads / Highways

$12,969,327.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

382

18

9

6

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
93
Bidding Soon
1,859
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

June 1, 2024

Project location map

FL-55, Clearwater, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.