BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 20, 2025 at 7:00 PM

Updated February 21, 2025

Renovation of a municipal facility in Rapid City, South Dakota. Completed plans call for the renovation of a municipal facility.

MRF DRUM ELECTRICAL ROOM IMPROVEMENTS This project will replace the existing electrical switchgear with equipment that meets current electrical and building codes. Each proposal must contain a certified check or cashier's check for five percent (5%) of the amount of the bid. Such check shall be certified or issued by either a State or National Bank and payable to the City of Rapid City, Rapid City, South Dakota, or in lieu thereof, a bid bond for ten percent (10%) of the amount bid, and such bond to be issued by a surety authorized to do business in this state and payable to the City of Rapid City, Rapid City, South Dakota, as a guarantee of the Bidder entering into a contract for the construction of the work and furnishing of a 100 percent (100%) performance bond. After this has been accomplished, the Bidder's check or bid bond will be returned, and the checks or bonds of all unsuccessful bidders will be returned upon thirty (30) days after the bids have been opened. The City reserves the right to reject any or all bids or to waive all informalities and to accept the bid that is to the advantage of and is in the best interest of the City of Rapid City. The Solid Waste Division is in need of professional engineering services for design, bidding, and construction for the Material Recovery Facility (MRF) Drum Electrical Room Improvements Project. The project will replace the existing main electrical service switchboard and electrical service conductors located in the MRF. The existing electrical equipment has reached the end of its useful life and needs replacement. The consultant will evaluate the existing conditions and will recommend/design the proper modifications to ensure that the new equipment meets current electrical and building codes. Coordination with the City and its consultants will be necessary to ensure the proposed improvements align with other planned and future projects at the MRF

Award

Municipal

$252,821.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
11
Bidding Soon
194
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

May 30, 2025

Project location map

To Be Determined, Rapid City, SD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.