Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Tulsa, Oklahoma. Completed plans call for site work for a water / sewer project.
The entire cost of the improvements shall be paid from Account No. 7503365-544003, 7503362-544003, 7503363-531307, 7500 193320007Z, 7500 2431S00013 Attention is called to Resolution No. 18145 of August 23, 1988, requiring bidders to commit to the goal of employing on the project at least fifty percent bona fide residents of the City of Tulsa and/or MSA in each employment classification. The Authority, acting on behalf of the City of Tulsa, is exempt from the payment of any sales or use taxes, and pursuant to Title 68 O.S. Section 1356(10), direct vendors to the Authority are also exempt from those taxes. A bidder may exclude from his bid appropriate sales taxes which he will not have to pay while acting for and on behalf of the Tulsa Metropolitan Utility Authority. See Contract Article IIB. A Certified or Cashier's Check or Bidder's Surety Bond, in the sum of 5% of the amount of the bid will be required from each bidder to be retained as liquidated damages in the event the successful bidder fails, neglects or refuses to enter into said contract for the construction of said public improvements for said project and furnish the necessary bonds within thirty days from and after the date the award is made. The bidder to whom a contract is awarded will be required to furnish public liability and workmen's compensation insurance; performance, statutory, and maintenance bonds acceptable to the Authority, in conformity with the requirements of the proposed contract documents. The performance, statutory, and maintenance bonds shall be for one hundred percent (100%) of the contract price TIME OF COMPLETION. The time of completion is an essential part of the contract and it will be necessary for each bidder to satisfy the Authority of his ability to complete the work within the allowable time set forth in the Bid Form. In this connection, attention is directed to the provisions of the General Conditions and Special Conditions relative to delays, extensions of time, and liquidated damages. TIME FOR AWARDING OF CONTRACT. The awarding of a contract to the lowest responsible bidder will be made within thirty (30) days after the opening of bids unless the Authority by formal recorded action and for good cause shown, provides for a reasonable extension of that period, which extension period shall not in any event exceed fifteen (15) days where only state or local funds are involved, or not to exceed ninety (90) days on any award of a contract for the construction of a public improvement where funds are utilized which are furnished by an agency of the federal government. HEREBY PROPOSES to enter into a contract to provide all necessary labor, materials, equipment and tools to completely construct and finish all the work required by the Contract Documents referred to therein; to complete said work within 365 calendar days after the work order is issued; and to accept in full payment therefore the amount set forth below for all work actually performed as computed by the Engineers as set forth in the Contract.
Award
Water / Sewer
$2,679,500.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 10, 2024
July 9, 2024
To Be Determined, Tulsa, OK
Related To This Project
Tulsa, OK
Bid Date: May 14 2024
Tulsa, OK
--
Tulsa, OK
--
Tulsa, OK
--
Tulsa, OK
--
Tulsa, OK
Bid Date: May 17 2024
Tulsa, OK
--
Tulsa, OK
Bid Date: May 21 2024
Tulsa, OK
--
Tulsa, OK
Bid Date: May 03 2024
Tulsa, OK
Bid Date: May 03 2024
Tulsa, OK
Bid Date: May 07 2024
Tulsa, OK
Bid Date: Apr 26 2024
Tulsa, OK
Bid Date: Apr 29 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.