Site work and paving for a civil project in San Francisco, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Work is at various locations in Districts 2 & 3 of San Francisco, California and consists of pavement renovation, curb ramp construction, sewer replacement, Emergency Firefighting Water System (EFWS) settlement monitoring and support work, traffic control, and all related work. 365 consecutive calendar days from NTP to Substantial Completion Class "A" license required to bid. LBE Subcontracting Participation Requirement is 25% LBE Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B If there are any questions on any Addenda that may have been issued, please contact Y T La, City and County of San Francisco, San Francisco Public Works, 49 S, Van Ness Avenue, Suite 800, San Francisco, CA 94103, telephone (628) 271-2461 or by email Y.T.La@sfdpw.org. SCOPE OF WORK A. The Contractor must prepare Traffic Control Plans, and install, operate, maintain and remove traffic control in conformance with the requirements in this section. The required traffic control work must be in place prior to the start of the construction work of the Contractor and/or any of the subcontractors. The Traffic Control Plans must clearly depict the exact sequence of the construction operation(s), the construction to be performed and the traveled way that will be utilized by all movement of traffic and pedestrians during each phase of construction. Multiple phases of construction will require a separate traffic control plan for each different construction phase or operation for working and nonworking hours. No typical Traffic Control Plans will be permitted except as approved by the Traffic Engineer. B. The Contractor or subcontractor (having Contractors Class A or Class C license issued by the State of California Contractors State License Board) may perform the Traffic Control work utilizing its own forces. If the Contractor chooses to hire a subcontractor solely to perform the Traffic Control work, subcontractor must possess a current C-31 Construction Zone Traffic Control license issued by the California Contractors State License Board. If the Contractor hires a subcontractor to perform other work, the subcontractor may perform traffic control incidental to that work. The Contractor or Subcontractor must provide sufficient traffic crews as required by the City Representative to implement and maintain the traffic control work. The Contractor or Subcontractor must provide flaggers as required by the City Representative and/or as shown on the approved Traffic Control Plans to control the vehicular traffic and to guide the pedestrians through the Construction area. Flaggers must not perform non-traffic related duties. There must be at least one (1) or more flaggers as required by the Traffic Engineer. The Traffic Crew must be comprised of at least two (2) dedicated persons. 1. Traffic Crew a. Assist in re-striping and setting up all traffic signs and other traffic control devices in accordance with the approved Traffic Control Plans. The required traffic control work must be in place prior to the start of the

Bid Results

Roads / Highways

$7,866,714.00

Public - City

Paving, Site Work

82

19

30

6

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Scheduling of Work, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Joint Protection, Preformed Joint Seals, Joint Gaskets, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Industrial Furniture, Welding Screens
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Cold Milling Asphalt Paving, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plugging, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
109
Bidding Soon
1,916
All Active Projects
929
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2024

August 26, 2024

img_map_placeholder

Multiple Locations, San Francisco, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Various Locations Pavement Renovation No. 62 And Sewer Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.