BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 4, 2024 at 8:00 PM

Updated October 5, 2024

Renovation of a municipal facility in Boon, Michigan. Conceptual plans call for the renovation of a municipal facility.

This project seeks to enhance the reliability and effectiveness of the electrical infrastructure along the Michigan Line by replacing approximately thirty (30) generators, each tailored to specific power requirements. Initially, the contractor will conduct a comprehensive survey to assess the existing conditions, power needs, functionality, and key features of the current utilities and electrical systems. Following the assessment, new generators will be installed along the line, in compliance with state, city, and Amtrak standards. The installation process will be carefully planned to minimize service disruptions while maintaining high safety and efficiency standards. Amtrak, (Owner), is seeking professional services to perform construction work including but not limited to the following: Amtrak shall have an option at any time, in its sole discretion, to add additional services associated with additional phases of this project to the scope of the Contract, subject to Amtrak's receipt of an acceptable proposal or proposals for such services from Contractor. Nothing herein shall obligate Amtrak to exercise options for award to the Contractor. In an effort to provide "maximum practicable opportunity" to participate in the provision of goods and services to Amtrak, prime firms under agreement with Amtrak are required to put forth Good Faith Efforts to contract with Disadvantaged Business Enterprises (DBEs). Therefore, a DBE subcontracting plan goal shall be established for this opportunity. IMPORTANT NOTE: The information contained herein may not be reissued or redistributed in any form or manner in whole or in part without the advanced expressed written consent and permission of Amtrak. The method of Contractor Selection has not been Determined at this time.

Conceptual

Municipal

$270,000.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
18
Bidding Soon
368
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

Project location map

To Be Determined, Boon, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.