Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 26, 2024 at 8:00 PM
Updated May 18, 2024
Site work and paving for a road / highway in Stillwater, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Washington County is removing and replacing its salt shed at its North Shop facility. A contractor has been secured for the installation of the new salt shed. This Request for Quote (RFQ) has been prepared by Washington County to secure services for bituminous paving in and around the new salt shed area prior to erecting the new shed. Questions Due May 8, 2024 Include instructions for questions from contractors. Such as, to notify the county of any inconsistency or ambiguity in this RFQ and for all questions pertaining to this RFQ, all questions and notifications must be sent via e-mail to the County Authorized Representative: Mike Kline, EIT michael.kline@co.washington.mn.us Municipal Meeting 05/22/2024 All aspects of the scope of services outlined below and included herein are expected to be completed. The 2020 edition of the Minnesota Department of Transportation "Standard Specifications For Construction" shall govern. All work must be completed according to the Plans (Appendix B) and Geotechnical Report (Appendix C). The work to be performed is not to exceed a specified amount. County authorized work completed outside the original scope may qualify for additional compensation. Bituminous paving work will not occur until the new shed footings have been set and the area has been prepped for paving. Coordination with the salt shed Contractor and Washington County is required to establish a paving date. Paving is expected to occur in mid-late June of 2024. Once paving operations have begun the contractor will have 3 days to complete all paving operations. The bituminous pavement mix design shall follow the "Heavy Duty Areas" section as shown in Table B in the geotechnical report (Appendix C). The pavement thicknesses shall be 2 1/2 " for bituminous wear and 2 1/2 " for bituminous base course.
Post-Bid
Roads / Highways
$410,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 17, 2024
June 17, 2024
11660 Myeron Rd N, Stillwater, MN
Related To This Project
Stillwater, MN
Bid Date: May 21 2024
Stillwater, MN
Bid Date: Jul 08 2025
Stillwater, MN
--
Stillwater, MN
Bid Date: May 30 2024
Stillwater, MN
Bid Date: May 27 2024
Stillwater, MN
Bid Date: May 29 2024
Stillwater, MN
Bid Date: Jun 25 2024
Stillwater, MN
--
Stillwater, MN
Bid Date: May 14 2024
Stillwater, MN
Bid Date: May 02 2024
Stillwater, MN
--
Stillwater, MN
Bid Date: May 08 2024
Stillwater, MN
Bid Date: Apr 30 2024
Stillwater, MN
--
Stillwater, MN
Bid Date: Apr 16 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
