BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Las Vegas, Nevada. Completed plans call for site work for a water / sewer project.

This project entails construction of an underground power conduit ductbank for Harry Reid International Airport. The ductbank extends from Harry Reid International Airport at Central Plant 1 to an existing NV Energy substation located at Russell Road and Annie Oakley Drive. The approximate length of the underground ductbank is 4 miles and is located within public right-of-ways, easements, and the private Airport roadway system. This project also includes construction of a turn lane beneath the Paradise Road bridge at the intersection with Flight Path Avenue. The proposed Contract is under and subject to Executive Order 11246, as amended, of September 24, 1965, and to the Equal Employment Opportunity (EEO) and Federal Labor Provisions. It is the policy of the Clark County Department of Aviation (OWNER) to promote the objectives of the United States Department of Transportation (DOT) with respect to the participation of Disadvantaged Business Enterprises (DBEs) in DOT-assisted contracts. The OWNER, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 200d-4) and the Regulations, hereby notifies all Bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. OWNER reserves the right to refuse to issue a bid form, or to accept a bid from a prospective Bidder should such Bidder be in default for any of the following reasons: Failure to comply with any pre-qualification regulations of OWNER, if such regulations are cited, or otherwise included, in the proposal as a requirement for bidding; or - Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contracts in force (with OWNER) at the time OWNER issues the proposal to a prospective Bidder; or - Contractor default under previous contracts with OWNER; or - Unsatisfactory work on previous contracts with OWNER. Question Cutoff Date: 5/8/2024 01:00 AM (ET)

Award

Water / Sewer

$19,954,244.00

Public - County

Site Work

230

20

6

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
15
Bidding Soon
386
All Active Projects
141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

June 20, 2024

img_map_placeholder

Multiple Locations, Las Vegas, NV

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.