BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Desert Hot Springs, California. Completed plans call for site work for a water / sewer project.

**As of June 05, 2024, This project has been awarded to TRI-STAR CONTRACTING, with the awarded amount of $792,905.85.** License Requirements Class A or Class C-34 Liquidated Damages $500 Estimated Bid Value 850,000.00 Project Duration 90 consecutive calendar days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 04/26/2024 12:00 PM (PDT) Contact Info Andrea Varela engineering@mswd.org. Remove and replace existing water lines at 13th Ave., Mission Lakes Blvd., and Thomas Ave. and Mission Creek. Install new pipe and appurtenances along the same alignment as the existing pipe in Mission Creek in the City of Desert Hot Springs. All proposals or bids shall be accompanied by a cashier's or certified check, payable to the order of Owner, amounting to ten percent (10%) of the bid or by a bond in said amount and payable to Owner, signed by the bidder and a corporate surety, or by the bidder and two (2) sureties who will justify before any officer competent to administer oaths, in double said amount and over and above all statutory exemption. Said check shall be forfeited or said bond shall become payable to Owner in case the bidder depositing the same does not, within ten (10) days after written notice, sign the contract.

Award

Water / Sewer

$792,906.00

Public - City

Site Work

5

8

4

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
50
Bidding Soon
828
All Active Projects
411
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2024

June 3, 2024

img_map_placeholder

13th Ave, Desert Hot Springs, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.