BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Iowa City, Iowa. Contact the soliciting agency for additional information.

All questions and clarifications regarding this Request for Proposal will be accepted until May 13, 2024 at noon (CT) by submitting your questions through Ion Wave. All questions must be in writing in order to receive a response. The City of Iowa City is requesting proposals from qualified planning consultant firms or individual consultants to assist in updating the City's Comprehensive Plan. The desired outcomes of this process include: 1. A new plan that places equity, climate change and resiliency, and housing at its core and addresses existing disparities and prepares us for the future. 2. A public process that uses varied methods of engagement to drive participation that is more reflective of the city's demographics and ensures underrepresented groups are actively engaged in the process. A robust outreach and engagement process upfront can serve as that strong foundation for a common vision that then can be implemented in a more streamlined fashion through streamlined approvals and more by-right development allowances. This can serve the community well and result in addressing our most pressing needs (e.g. diverse housing supply) in a more timely manner. 3. A regional housing needs assessment, evaluation of current land use policy, as well as other updated analyses that will allow us to better understand changing needs, trends, and demographics. These updated analysis will help to inform the vision and land use policy direction. (Please note: The regional housing needs assessment will be completed by another vendor. The City will supply the successful vendor with the regional housing needs assessment so that they can incorporate it into the Comprehensive Plan). 4. A clear connection between the Comprehensive Plan and the City's other planning documents. Examples include the Strategic Plan, Bike Master Plan, Capital Improvement Plan, Climate Action and Adaptation Plan and others. All these plans will need to be reviewed since the Comprehensive Plan should function as the overarching policy document that incorporates and references the vision and goals of other plans as needed. 5. A new planning framework that identifies specific typologies unique enough to warrant further planning efforts. Examples include community nodes/centers, corridors, employment centers, and others. 6. Scenario planning to help residents envision and understand different development outcomes for Iowa City and what implications those choices carry into the future. Scenario planning will inform an updated Future Land Use Map of the Comprehensive Plan with land use designations that include descriptions of general intended land uses, as well as physical characteristics of the envisioned built environment. The plan will also include a land use designation table with clear descriptions and an explanation of how these designations work with the City's zoning districts. 7. An implementation program that identifies specific actions that should be pursued to implement the vision of the plan.

Conceptual

Municipal

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
45
Bidding Soon
416
All Active Projects
208
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2025

img_map_placeholder

Multiple Locations, Iowa City, IA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.