BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 17, 2024 at 8:00 PM

Updated May 21, 2024

Demolition, site work, paving and renovation of a mixed-use development in Killeen, Texas. Completed plans call for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; for paving for a educational facility; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

Work Included: 1. The "Project" of which the "Work" of this Contract is a part, is titled Killeen High School Building 7 Renovations for Killeen ISD and is composed of interior building renovations and related site work located in Killeen, Texas. 2. The "Work" of this Contract is titled Killeen High School Building 7 Renovations and is defined in the Contract Documents to include, but not necessarily to be limited to: a. Interior building renovations and site work, including all mechanical, electrical, plumbing, and general construction work. 3. Related Work: a. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 01 of these Specifications. b. The work of other contracts is described in various contract documents prepared therefore, some of which are in the possession of the Owner and are available for inspection by interested parties. Other Work: 1. Owner (if required by Municipality, State or Federal requirements) shall provide evidence to the municipality permitting the project that an asbestos survey has been completed by a person licensed under the Texas Asbestos Health Protection Act to perform such a survey. 2. The architect has no responsibility for the discovery, presence, handling, removal or disposal of or exposure of persons to hazardous materials or toxic substances in any form at the project site. 3. The architect is not required to execute certifications that would require knowledge, services or responsibilities beyond the scope of the architectural service agreement. 4. The architect assists the owner in the owner's responsibility to obtain applicable permits for demolition and construction. 5. Contractor to review and familiarize themselves with owner's Asbestos survey and plan and shall inform every worker that they use on this project as to the availability of these surveys and plans prior to starting any work. PRECONSTRUCTION MEETINGS A. A Kick-Off Pre-Construction meeting will be scheduled to be held upon notification by the Architect. 1. Provide attendance by authorized representatives of the Contractor and major subcontractors. 2. The Architect will advise other parties, including the Owner, and request their attendance. 3. The Architect shall arrange, preside, and record the minutes of the pre-construction meeting. 4. A pre-construction meeting agenda will be issued by the Architect at the meeting. 5. Agenda items to be discussed include: a. Self introductions b. Design concept, scope, and objectives c. Communications d. Contractor's responsibilities e. Documentation and notification f. Progress Meetings g. Submittals/Substitutions h. Project Administration i. Project Closeout j. Warranty Phase B. Quality Control Pre-Construction Meeting 1. Within one week after the "Foundation Pre-Construction Meeting", the Contractor shall schedule and host a "Quality Control Pre-Construction Meeting" following the Agenda in Section 01 4533. C. Framing Pre-Construction Meeting: The Contractor shall not be permitted to install any portion of the superstructure above the foundation until the Contractor has scheduled and held a "General Framing Preconstruction Meeting" in which the following people attend: A representative of the Architect, a representative of the Structural Engineer, the Special Inspection and Testing Agency (SITA), the Superintendent of construction, the Contractor's Project Manager, and all foremen for subcontractors with work related to the framing. Question Deadline 05/09/2024 at 2:00 PM CT

Post-Bid

Educational

$20,445,000.00

Public - City

Demolition, Paving, Renovation, Site Work

13

16

36

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
95
Bidding Soon
1,930
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.