BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for an educational facility in Warrensburg, Missouri. Completed plans call for site work for a educational facility.

Any and all communication from bidders regarding specifications, requirements, competitive procurement process, etc., must be directed to the buyer as indicated in the Bid Contact Information section. Communication made with parties outside of Procurement may result in your solicitation response being disqualified; UCM bids are secured until the closing date and time. Bid pricing is available for viewing when the bid is unsealed. To access bid pricing after the bid is unsealed, go to the UCM, click Closed Bids, the bid number, Bid Tabulation by Supplier. Note: Pending any award, the bid is reviewed and evaluated for responsiveness and responsibility. No award will be made until the evaluation and review is complete by UCM. Completion Date The Notice to Proceed is preferred to be July 1, 2024 if Contractor can have all documents to UCM Procurement by that date. Contractor shall complete all aspects of the project by August 10, 2024. Project Work I have carefully examined the Work Documents & attachments and I fully understand the type and quality of the product(s)and/or service(s) described and hereby propose to supply such at the prices stated in accordance with this solicitation. Liquidated Damages Bidder acknowledges and accepts, if the project is not substantially and fully completed by the date in the contract, liquidated damages shall begin as defined in the Specifications. All inquiries regarding these specifications or other bid documents shall be directed via Email request to Bob Walla - Procurement Director (walla@ucmo.edu) 1.8.1 These inquiries and/or responses shall be distributed to prospective Vendors as an electronic addenda in the Ebid system. 1.8.2 All inquiries must be submitted to the Procurement Office at least three (3) calendar days prior to the bid close The bidder shall have as a goal subcontracting not less than five percent (5%) of the awarded contract price for work to be performed of MBE/WBE(s).

Post-Bid

Educational

$1,300,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
31
Bidding Soon
708
All Active Projects
275
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2024

July 1, 2024

img_map_placeholder

447 E Division Rd, Warrensburg, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.