EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 10, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Suffern, New York. Completed plans call for the renovation of a water / sewer project.

Reference Number 0000350439 The project consists of the following: Coordinate with the Village of Suffern STP Operator and/or his designatee. Demolish the existing UV units and their associated control panels and electrical components. Demolish the existing vertical turbine UV pumps. Demolish the chemical feed system and water lines as shown on the plans. Furnish and install two (2) non-contact type UV units and their appurtenances. (Electrical connections by others.) Furnish and install an elevated platform between the UV units. Furnish and install three (3) vertical turbine pumps. (Electrical connections by others.) Furnish and install two (2) electrically actuated butterfly valves and a control panel. (Electrical connections by others.) Bidders for this project are required to comply with the Village Apprenticeship Training Program requirements. The Contractor shall provide all labor, supervision, materials, equipment, tools, utilities, and incidentals necessary to complete the Work as specified in the Technical Specifications and as shown on the Plans. This project is funded with New York State Financial Assistance and is subject to MWBE and SDVOB goals and additional required documentation. Question Deadline 05/23/2024 at 4:00 PM ET Per addendum 1, question date extended from [5/16/24]. Every request for such interpretation should be in writing addressed to Pitingaro & Doetsch Consulting Engineers, P.C. 20 Industrial Drive, Middletown NY 10941, and to be given consideration must be received at least five (5) days prior to the date fixed for the opening of bids. *The Village of Suffern hereinafter called the Owner, reserves the right to reject any or all Bids and to waive any formality or technicality in any Bid in the interest of the Owner. All checks shall be drawn payable to Pitingaro & Doetsch Consulting Engineers P.C. and mailed via first class mail to 20 INDUSTRIAL DRIVE, MIDDLETOWN, NY 10941----OR--- these documents may be sent electronically for $25.00 upon an email request to Linda Kump at lkump@panddengineers.com.

Award

Water / Sewer

$1,129,890.00

Public - City

Renovation

8

13

4

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Composite Roof Panels, Composite Wall Panels, Joint Protection
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Cleaning Devices
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
541
Active Projects
340
Bidding Soon
4,999
All Active Projects
2,147
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2024

June 20, 2024

img_map_placeholder

1 Ed Fagan Dr, Suffern, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

STP UV Replacement Project- General Contract

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.