Site work and paving for a mixed-use development in Monroe, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Subcontractor lists must be submitted within the deadline listed on the forms. This Contract provides for the replacement of the aging watermain under Dickinson Road, the extension of an existing sewer line, as well as addressing stormwater ponding issues at various locations along this road. The water main replacement phase of the project will involve the installation of approximately 940 lineal feet of 8-inch diameter ductile iron pipe, 20 lineal feet of 6-inch ductile iron pipe and 20 feet of 4-inch ductile iron pipe. It will also include the installation of a hydrant assembly and the replacement of seven (7) service connections. The sewer extension construction phase of this project will include the installation of 450 LF of 8- inch PVC Sewer Pipe, 180 lineal feet of 6-inch Sanitary Sewer Pipe and three (3) 48-inch Type I Manholes. The stormwater pipe network construction phase of this project will include the installation of approximately 600 lineal feet of 12-inch diameter storm pipe, and 170 lineal feet of 8-inch diameter storm pipe. It will include the installation of seven (7) Type I catch basins, three (3) Type II catch basins, four (4) Water Quality Catch Basin Type 148-inch Manholes with 27-inch WQ Filter Cartridge two catch basin inlets. The pipe network will drain to three (3) infiltration galleries containing 410 lineal feet of 12-inch diameter perforated pipes. The project will include removal and restoration of asphalt surfacing, concrete sidewalks, curb ramps, curbs and gutters, fencing and gates, seeding, landscaping, and other features within the right-of-way as necessary to install the stormwater improvements and other work, all in accordance with the attached Contract Plans, Contract Provisions, and the Standard Specifications. The Engineer's opinion of probable construction cost is approximately $2,000,000.00. Contractor shall not begin any roadway excavation work until the Monroe School District is not in session. The first date of roadway excavation work shall begin on June 24, 2024. Questions regarding this Project may be directed only to Cathy Hawkins, Supervisor Construction Documents Coordinator, City of Monroe, Phone (360) 863-4514, Email: PWContracts@monroewa.gov. Questions received after April 25, 2024, at 5:00 p.m. (2 full business days) may not be considered. All Bid Proposals must be submitted on the forms furnished in the Contract Provisions, and each must be accompanied by a certified check, cashier's check, or bid bond (with authorized surety company as surety) made payable to the City of Monroe in an amount not less than five percent (5%) of the total bid including sales tax, and all listed additives and alternates, if any. Cash will not be accepted. Washington State Prevailing Wage Rates for Snohomish County apply to this Project. The City of Monroe reserves the right to reject any or all bids and to waive any irregularities in the bid or in the bidding process, and make the award as deemed to be in the best interest of the City. The City of Monroe in accordance with Title VI of the Civil Rights Act of 1964,78 Stat. 252,42 U.S.C. 2oood to 2OOod-4 and Title 49, Code of Federal Regulations, Department of transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such ACT, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. This Contract provides for the replacement of the aging watermain under Dickinson Road, the extension of an existing sewer line, as well as addressing stormwater ponding issues at various locations along this road. The water main replacement phase of the project will involve the installation of approximately 940 LF of 8 inch diameter ductile iron pipe, 20 LF of 6 inch ductile iron pipe and 20 feet of 4 inch ductile iron pipe. It will also include the installation of a hydrant assembly and the replacement of seven (7) service connections. The sewer extension construction phase of this project will include the installation of 450 LF of 8” PVC Sewer Pipe, 180 LF of 6” Sanitary Sewer Pipe and three (3) 48” Type I Manholes. The stormwater pipe network construction phase of this project will include the installation of approximately 600 LF of 12 inch diameter storm pipe, and 170 LF of 8 inch diameter storm pipe. It will include the installation of seven (7) Type I catch basins, three (3) Type II catch basins, four (4) Water Quality Catch Basin Type 1 48 inch Manholes with 27” WQ Filter Cartridge two catch basin inlets. The pipe network will drain to three (3) infiltration galleries containing 410 LF of 12 inch diameter perforated pipes. The project will include removal and restoration of asphalt surfacing, concrete sidewalks, curb ramps, curbs and gutters, fencing and gates, seeding, landscaping, and other features within the right-of-way as necessary to install the stormwater improvements and other work, all in accordance with the attached Contract Plans, Contract Provisions, and the Standard Specifications. Questions regarding this Project may be directed only to Cathy Hawkins, Supervisor Construction Documents Coordinator, City of Monroe, Phone (360) 863-4514, Email: PWContracts@monroewa.gov. Questions received after April 25, 2024 at 5:00 p.m. (2 full business days) may not be considered.
Bid Results
Water / Sewer
$1,797,371.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2024
June 29, 2024
Dickinson Rd, Monroe, WA
Related To This Project
Monroe, WA
Bid Date: May 23 2024
Monroe, WA
Bid Date: Nov 17 2021
Monroe, WA
Bid Date: Jun 19 2024
Monroe, WA
Bid Date: Jun 13 2024
Monroe, WA
Bid Date: Jul 11 2024
Monroe, WA
Bid Date: Oct 24 2024
Monroe, WA
Bid Date: Dec 11 2024
Monroe, WA
Bid Date: May 02 2024
Monroe, WA
Bid Date: Apr 18 2024
Fire Alarm System Inspection, Maintenance, Testing and Repair, Evergreen State Fairgrounds - 5369186
Monroe, WA
Bid Date: Apr 18 2024
Monroe, WA
Bid Date: Apr 18 2024
Monroe, WA
Bid Date: Apr 22 2024
Monroe, WA
Bid Date: Mar 28 2024
Monroe, WA
Bid Date: Mar 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.