BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Nicholasville, Kentucky. Completed plans call for the renovation of a water / sewer project.

Odor Control Scrubber System Refurbishment Question Cuttoff Date & Time 4/30/2024 04:00:00 PM (ET) A certified check or Bid Bond in the amount of 5 percent of the bid price must be attached hereto for bids greater than $50,000. This check must be made payable to the Lexington-Fayette Urban County Government, and will be returned when the material and/or services specified herein have been delivered in accordance with specifications. In the event of failure to perform within the time period set forth in this bid, it is agreed the certified check may be cashed and the funds retained by the Lexington-Fayette Urban County Government as liquidated damages. Checks of unsuccessful bidders will be returned when the bid has been awarded. At a minimum, the Scope of Work includes the following: 1. Acid wash system to remove all buildup and inspect the internal sump area for any Fiber Reinforced Plastic (FRP) defects. 2. Inspect the spray nozzles for proper coverage of packing media. 3. Replace media, if recommended post acid wash by Original Equipment Manufacturer (OEM). 4. Replace all gaskets on manways. 5. Replace chemical pumps and motors. 6. Replace chemical piping per OEM recommendation. 7. Confirm operation and condition of recirculation pumps. 8. Replace the recirculation pump piping, valves, instrumentation, etc., per OEM recommendation. 9. Replace rotameters and makeup water piping, valves etc. 10. Replace chemical metering discharge piping and modify injection point into the sump, as recommendation from OEM. 11. Replace pH and ORP probes and controllers. Calibrate new instruments. 12. The control panel is missing a Dart control board - replace missing Dart control board and program / commission as necessary. 13. Supply and Install new Fan P-traps. 14. Replace both drain/Overflow piping arrangements. 15. Replace sump lo-level switches. 16. Replace fan belts. 17. Replace sight tubing on both chemical tanks. 2 18. Rince and clean both chemical tanks 19. Check condition and operation of the chemical tank level transmitters. Reprogram as required for correct operation. 20. Check condition and operation of the chemical tank program controllers on electrical control panel. 21. Check electrical panel and all functions. 22. After system repairs / modification are completed, restart & recommission system per OEM recommendations. 23. Provide O&M documentation for any updated equipment. 24. Provide operator training by a factory-trained technician. All inspections must be coordinated with Tom Hilbrand, Chief Plant Operations Manager (859) 425-2414

Post-Bid

Water / Sewer

$500,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
45
Bidding Soon
738
All Active Projects
306
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2024

June 12, 2024

img_map_placeholder

645 W Hickman Plant Rd, Nicholasville, KY

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.