BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 10, 2024 at 8:00 PM

Updated May 11, 2024

Site work for a bridge / tunnel in Smithville, Ontario. Completed plans call for site work for a bridge / tunnel.

This contract encompasses the provision of all labour, materials, and equipment necessary for the completion of the following: Repair of the concrete deck, girders, abutments, conversion to semi-integral abutment, abutment bearing replacements, addition of an approach slab, guiderail installation, roadway approach works, and erosion control on the embankments. Documents may be obtained at https://westlincoln.bidsandtenders.ca/ Award subject to final approval.

Award

Bridges / Tunnels

$447,823.00

Public - City

Site Work

7

13

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
452
Active Projects
181
Bidding Soon
4,850
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2024

June 3, 2024

Project location map

Multiple Locations, Smithville, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.